IAC logo
IAC Assessment: AM0401
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AM0401
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, College Station
Assessment Year 2001
Principal Product Petroleum refining
NAICS n/a
SIC 2911 - Petroleum Refining
Sales >$500,000,000
# of Employees 130
Plant Area (Sq.Ft.) 0
Annual Production 382,200 Thousand Gallons
Production Hrs. Annual 8,760
Location (State) UT
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $963,738 47,952,000 kWh $0.02
Electricity Demand $421,700 73,853 kW-months/year $5.71
Electricity Fees $(-42,988) - $ -
Natural Gas $4,546,124 916,433 MMBtu $4.96
TOTAL ENERGY COSTS $5,888,574
RECOMMENDED SAVINGS* $327,390 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $209,500
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Administrative Changes Electricity Usage Electricity Demand Natural Gas Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.2113 REPAIR OR REPLACE STEAM TRAPS Savings:
$147,000
Cost:
$800
- - - - $147,000 29,300 - - -
-
kWh
-
-
kW-months/year
$147,000
29,300
MMBtu
-
-
$
02: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$76,500
Cost:
-
$73,600 3,346,700 $2,900 460 - - - - $73,600
3,346,700
kWh
$2,900
460
kW-months/year
-
-
MMBtu
-
-
$
03: 2.2511 INSULATE BARE EQUIPMENT Savings:
$46,800
Cost:
$1,400
- - - - $46,800 9,300 - - -
-
kWh
-
-
kW-months/year
$46,800
9,300
MMBtu
-
-
$
04: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$27,020
Cost:
$119,000
$18,950 861,200 $8,070 1,280 - - - - $18,950
861,200
kWh
$8,070
1,280
kW-months/year
-
-
MMBtu
-
-
$
05: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$13,200
Cost:
$28,000
- - $13,200 2,090 - - - - -
-
kWh
$13,200
2,090
kW-months/year
-
-
MMBtu
-
-
$
06: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$12,300
Cost:
-
- - $12,300 1,960 - - - - -
-
kWh
$12,300
1,960
kW-months/year
-
-
MMBtu
-
-
$
07: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$3,400
Cost:
$1,000
- - - - $3,400 670 - - -
-
kWh
-
-
kW-months/year
$3,400
670
MMBtu
-
-
$
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,170
Cost:
$700
$125 5,660 $50 8 - - $995 - $125
5,660
kWh
$50
8
kW-months/year
-
-
MMBtu
$995
-
$
TOTAL RECOMMENDED Savings:
$327,390
Cost:
$150,900
$92,675 4,213,560 $36,520 5,798 $197,200 39,270 $995 - $92,675
4,213,560
kWh
$36,520
5,798
kW-months/year
$197,200
39,270
MMBtu
$995
-
$
TOTAL IMPLEMENTED Savings:
$209,500
Cost:
$3,200
- - $12,300 1,960 $197,200 39,270 - - -
-
kWh
$12,300
1,960
kW-months/year
$197,200
39,270
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $