IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, College Station
Assessment Year 2001
Principal Product Expanded Polyolefin
NAICS n/a
SIC 2821 - Plastics Materials And Resins
Sales $100,000,000-$500,000,000
# of Employees 200
Plant Area (Sq.Ft.) 0
Annual Production 130,000,000 Pounds
Production Hrs. Annual 8,760
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $2,047,432 58,294,873 kWh $0.04
Electricity Demand $675,933 95,068 kW-months/year $7.11
Electricity Fees $31,608 - $ -
Natural Gas $3,537,126 722,000 MMBtu $4.90
TOTAL ENERGY COSTS $6,292,099
RECOMMENDED SAVINGS* $134,010 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $70,240
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Solid Waste (non-haz) Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Water Disposal Solid Waste (non-haz) Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ lb $ $ $ $
01: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY Savings:
$36,000
Cost:
-
- - - - - - - - - - - - $36,000 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
$36,000
-
$
02: 3.4154 ELIMINATE LEAKS IN WATER LINES AND VALVES Savings:
$30,400
Cost:
$1,770
- - - - - - $30,400 9,050,000 - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$30,400
9,050,000
Tgal
-
-
lb
-
-
$
-
-
$
03: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$12,290
Cost:
-
- - $12,290 1,570 - - - - - - - - - - -
-
kWh
$12,290
1,570
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
$
04: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$10,980
Cost:
-
$8,730 203,100 $2,250 287 - - - - - - - - - - $8,730
203,100
kWh
$2,250
287
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
$
05: 3.5248 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE Savings:
$10,730
Cost:
-
- - - - - - - - $10,730 104,760 - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
$10,730
104,760
lb
-
-
$
-
-
$
06: 2.2121 INCREASE AMOUNT OF CONDENSATE RETURNED Savings:
$16,000
Cost:
$4,200
- - - - $5,100 763 $10,900 2,770,700 - - - - - - -
-
kWh
-
-
kW-months/year
$5,100
763
MMBtu
$10,900
2,770,700
Tgal
-
-
lb
-
-
$
-
-
$
07: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$7,050
Cost:
$5,890
$7,050 164,100 - - - - - - - - - - - - $7,050
164,100
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
$
08: 3.4151 MINIMIZE WATER USAGE Savings:
$4,500
Cost:
$5,100
$(-4,800) (-111,000) $(-1,200) (-152) - - $10,500 3,150,000 - - - - - - $(-4,800)
(-111,000)
kWh
$(-1,200)
(-152)
kW-months/year
-
-
MMBtu
$10,500
3,150,000
Tgal
-
-
lb
-
-
$
-
-
$
09: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,380
Cost:
$2,640
$770 17,970 $190 25 - - - - - - $2,420 - - - $770
17,970
kWh
$190
25
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
$2,420
-
$
-
-
$
10: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$1,400
Cost:
-
$1,400 32,900 - - - - - - - - - - - - $1,400
32,900
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
$
11: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$900
Cost:
-
- - $900 160 - - - - - - - - - - -
-
kWh
$900
160
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
$
12: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$380
Cost:
-
$380 8,850 - - - - - - - - - - - - $380
8,850
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$134,010
Cost:
$19,600
$13,530 315,920 $14,430 1,890 $5,100 763 $51,800 14,970,700 $10,730 104,760 $2,420 - $36,000 - $13,530
315,920
kWh
$14,430
1,890
kW-months/year
$5,100
763
MMBtu
$51,800
14,970,700
Tgal
$10,730
104,760
lb
$2,420
-
$
$36,000
-
$
TOTAL IMPLEMENTED Savings:
$70,240
Cost:
$14,500
$9,600 223,820 $1,090 185 $5,100 763 $41,300 11,820,700 $10,730 104,760 $2,420 - - - $9,600
223,820
kWh
$1,090
185
kW-months/year
$5,100
763
MMBtu
$41,300
11,820,700
Tgal
$10,730
104,760
lb
$2,420
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ lb $ $ $ $
Electricity Usage Electricity Demand Natural Gas Water Disposal Solid Waste (non-haz) Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Water Disposal Solid Waste (non-haz) Personnel Changes Ancillary Material Cost