IAC logo
IAC Assessment: AM0411
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AM0411
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, College Station
Assessment Year 2002
Principal Product Sand
NAICS n/a
SIC 1446 - Industrial Sand
Sales $10,000,000-$50,000,000
# of Employees 77
Plant Area (Sq.Ft.) 0
Annual Production 750,000 Tons
Production Hrs. Annual 7,100
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,485,391 26,189,775 kWh $0.06
Electricity Demand $380,919 54,819 kW-months/year $6.95
Electricity Fees $1,452 - $ -
Natural Gas $276,411 69,060 MMBtu $4.00
LPG $731,750 97,832 MMBtu $7.48
Fuel Oil #2 $376,492 49,234 MMBtu $7.65
TOTAL ENERGY COSTS $3,252,415
RECOMMENDED SAVINGS* $29,540 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $29,540
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Personnel Changes Administrative Changes Electricity Usage Electricity Demand Personnel Changes Administrative Changes
$ kWh $ kW-months/year $ $ $ $
01: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$8,800
Cost:
-
- - $8,800 1,600 - - - - -
-
kWh
$8,800
1,600
kW-months/year
-
-
$
-
-
$
02: 2.8123 PAY UTILITY BILLS ON TIME Savings:
$6,350
Cost:
-
- - - - - - $6,350 - -
-
kWh
-
-
kW-months/year
-
-
$
$6,350
-
$
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$6,140
Cost:
$33,400
$5,540 72,840 $600 144 - - - - $5,540
72,840
kWh
$600
144
kW-months/year
-
-
$
-
-
$
04: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$2,680
Cost:
$340
$1,840 34,050 $840 123 - - - - $1,840
34,050
kWh
$840
123
kW-months/year
-
-
$
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,190
Cost:
$560
$1,070 14,100 $120 28 - - - - $1,070
14,100
kWh
$120
28
kW-months/year
-
-
$
-
-
$
06: 3.6192 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL Savings:
$1,440
Cost:
$600
- - - - $1,440 - - - -
-
kWh
-
-
kW-months/year
$1,440
-
$
-
-
$
07: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$1,140
Cost:
-
$950 12,500 $190 45 - - - - $950
12,500
kWh
$190
45
kW-months/year
-
-
$
-
-
$
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,070
Cost:
$205
$460 6,060 $35 8 $575 - - - $460
6,060
kWh
$35
8
kW-months/year
$575
-
$
-
-
$
09: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$580
Cost:
$260
$580 7,160 - - - - - - $580
7,160
kWh
-
-
kW-months/year
-
-
$
-
-
$
10: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$150
Cost:
-
$150 1,915 - - - - - - $150
1,915
kWh
-
-
kW-months/year
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$29,540
Cost:
$35,365
$10,590 148,625 $10,585 1,948 $2,015 - $6,350 - $10,590
148,625
kWh
$10,585
1,948
kW-months/year
$2,015
-
$
$6,350
-
$
TOTAL IMPLEMENTED Savings:
$29,540
Cost:
$35,365
$10,590 148,625 $10,585 1,948 $2,015 - $6,350 - $10,590
148,625
kWh
$10,585
1,948
kW-months/year
$2,015
-
$
$6,350
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $
Electricity Usage Electricity Demand Personnel Changes Administrative Changes Electricity Usage Electricity Demand Personnel Changes Administrative Changes