IAC Assessment: AM0514
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, College Station
Assessment Year 2006
Principal Product Semiconductors
NAICS 334413 - Semiconductor and Related Device Manufacturing
SIC 3674 - Semiconductors And Related Devices
Sales >$500,000,000
# of Employees 1,500
Plant Area (Sq.Ft.) 1,000,000
Annual Production 438,000 Pieces
Production Hrs. Annual 8,760
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $8,631,919 164,686,000 kWh $0.05
Electricity Demand $716,290 245,545 kW-months/year $2.92
Electricity Fees $217,715 - $ -
Natural Gas $1,077,636 132,106 MMBtu $8.16
TOTAL ENERGY COSTS $10,643,560
RECOMMENDED SAVINGS* $233,427 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $204,125
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ gal $ $
01: 2.1336 INSTALL EQUIPMENT TO UTILIZE WASTE FUEL Savings:
$189,400
Cost:
$50,000
- - - - $89,400 9,240 $100,000 110,000 - - -
-
kWh
-
-
kW-months/year
$89,400
9,240
MMBtu
$100,000
110,000
gal
-
-
$
02: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$27,782
Cost:
-
$25,818 320,725 $1,964 439 - - - - - - $25,818
320,725
kWh
$1,964
439
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
03: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$9,900
Cost:
$500
- - - - $9,900 1,023 - - - - -
-
kWh
-
-
kW-months/year
$9,900
1,023
MMBtu
-
-
gal
-
-
$
04: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$2,520
Cost:
$790
$2,470 31,680 $50 12 - - - - - - $2,470
31,680
kWh
$50
12
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,305
Cost:
$1,450
$335 4,160 $25 6 - - - - $1,945 - $335
4,160
kWh
$25
6
kW-months/year
-
-
MMBtu
-
-
gal
$1,945
-
$
06: 2.2511 INSULATE BARE EQUIPMENT Savings:
$1,520
Cost:
$100
- - - - $1,520 157 - - - - -
-
kWh
-
-
kW-months/year
$1,520
157
MMBtu
-
-
gal
-
-
$
TOTAL RECOMMENDED Savings:
$233,427
Cost:
$52,840
$28,623 356,565 $2,039 457 $100,820 10,420 $100,000 110,000 $1,945 - $28,623
356,565
kWh
$2,039
457
kW-months/year
$100,820
10,420
MMBtu
$100,000
110,000
gal
$1,945
-
$
TOTAL IMPLEMENTED Savings:
$204,125
Cost:
$52,740
$2,805 35,840 $75 18 $99,300 10,263 $100,000 110,000 $1,945 - $2,805
35,840
kWh
$75
18
kW-months/year
$99,300
10,263
MMBtu
$100,000
110,000
gal
$1,945
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ gal $ $
Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Ancillary Material Cost