IAC logo
IAC Assessment: AM0866
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AM0866
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, College Station
Assessment Year 2023
Principal Product Treated wastewater
NAICS 221320 - Sewage Treatment Facilities
SIC 4952 - Sewerage Systems
Sales $5,000,000-$10,000,000
# of Employees 2
Plant Area (Sq.Ft.) 590,000
Annual Production 109,500 Thousand Gallons
Production Hrs. Annual 8,760
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $148,101 3,901,398 kWh $0.04
Electricity Demand $55,871 7,089 kW-months/year $7.88
Electricity Fees $5,685 - $ -
TOTAL ENERGY COSTS $209,657
RECOMMENDED SAVINGS* $27,698 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $8,563
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Ancillary Material Cost Electricity Usage Electricity Demand Ancillary Material Cost
$ kWh $ kW-months/year $ $
01: 2.6221 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY Savings:
$16,120
Cost:
$700
$16,120 435,560 - - - - $16,120
435,560
kWh
-
-
kW-months/year
-
-
$
02: 2.4156 ESTABLISH A PREVENTATIVE MAINTENANCE PROGRAM Savings:
$6,607
Cost:
$4,020
$1,848 49,956 $3,901 495 $858 - $1,848
49,956
kWh
$3,901
495
kW-months/year
$858
-
$
03: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$3,015
Cost:
$16,615
- - $3,015 383 - - -
-
kWh
$3,015
383
kW-months/year
-
-
$
04: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$780
Cost:
-
$560 15,130 $220 28 - - $560
15,130
kWh
$220
28
kW-months/year
-
-
$
05: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$630
Cost:
$3,605
$470 12,800 $160 20 - - $470
12,800
kWh
$160
20
kW-months/year
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$510
Cost:
$2,441
$688 18,602 - - $(-178) - $688
18,602
kWh
-
-
kW-months/year
$(-178)
-
$
07: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$36
Cost:
$18
$20 525 $16 2 - - $20
525
kWh
$16
2
kW-months/year
-
-
$
TOTAL RECOMMENDED Savings:
$27,698
Cost:
$27,399
$19,706 532,573 $7,312 928 $680 - $19,706
532,573
kWh
$7,312
928
kW-months/year
$680
-
$
TOTAL IMPLEMENTED Savings:
$8,563
Cost:
$10,084
$3,586 97,013 $4,297 545 $680 - $3,586
97,013
kWh
$4,297
545
kW-months/year
$680
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Ancillary Material Cost Electricity Usage Electricity Demand Ancillary Material Cost