IAC logo
IAC Assessment: AR0032
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AR0032
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Arkansas
Assessment Year 1994
Principal Product Processed Meat Products
NAICS n/a
SIC 2011 - Meat Packing Plants
Sales $50,000,000-$100,000,000
# of Employees 700
Plant Area (Sq.Ft.) 175,000
Annual Production 50,000,000 Pounds
Production Hrs. Annual 6,257
Location (State) AR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,042,498 16,647,714 kWh $0.06
Natural Gas $261,941 83,742 MMBtu $3.13
TOTAL ENERGY COSTS $1,304,439
RECOMMENDED SAVINGS* $114,310 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $65,591
#|Description Savings
Cost
Status Electricity Usage Natural Gas Personnel Changes Electricity Usage Natural Gas Personnel Changes
$ kWh $ MMBtu $ $
01: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$1,550
Cost:
$1,058
$1,550 24,619 - - - - $1,550
24,619
kWh
-
-
MMBtu
-
-
$
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$3,660
Cost:
$6,380
$3,660 58,324 - - - - $3,660
58,324
kWh
-
-
MMBtu
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$735
Cost:
$100
$735 11,723 - - - - $735
11,723
kWh
-
-
MMBtu
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$6,980
Cost:
$1,654
$6,980 111,372 - - - - $6,980
111,372
kWh
-
-
MMBtu
-
-
$
05: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$12,331
Cost:
$1,730
$12,331 196,952 - - - - $12,331
196,952
kWh
-
-
MMBtu
-
-
$
06: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$33,863
Cost:
$1,000
- - $33,863 10,819 - - -
-
kWh
$33,863
10,819
MMBtu
-
-
$
07: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$4,438
Cost:
$635
$4,438 - - - - - $4,438
-
kWh
-
-
MMBtu
-
-
$
08: 2.4134 REPLACE ELECTRIC MOTOR WITH FOSSIL FUEL ENGINE Savings:
$48,719
Cost:
$52,000
$68,797 1,098,769 $(-5,078) (-3,478) $(-15,000) - $68,797
1,098,769
kWh
$(-5,078)
(-3,478)
MMBtu
$(-15,000)
-
$
09: 2.2511 INSULATE BARE EQUIPMENT Savings:
$2,034
Cost:
$213
$2,034 32,532 - - - - $2,034
32,532
kWh
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$114,310
Cost:
$64,770
$100,525 1,534,291 $28,785 7,341 $(-15,000) - $100,525
1,534,291
kWh
$28,785
7,341
MMBtu
$(-15,000)
-
$
TOTAL IMPLEMENTED Savings:
$65,591
Cost:
$12,770
$31,728 435,522 $33,863 10,819 - - $31,728
435,522
kWh
$33,863
10,819
MMBtu
-
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Personnel Changes Electricity Usage Natural Gas Personnel Changes