IAC Assessment: AR0034
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AR0034
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Arkansas
Assessment Year 1995
Principal Product Aircraft Nacelles
NAICS n/a
SIC 3728 - Aircraft Parts And Equipment, Nec
Sales $50,000,000-$100,000,000
# of Employees 135
Plant Area (Sq.Ft.) 120,000
Annual Production 2,500 Pieces
Production Hrs. Annual 4,171
Location (State) AR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $230,081 2,706,038 kWh $0.09
Natural Gas $21,906 4,450 MMBtu $4.92
TOTAL ENERGY COSTS $251,987
RECOMMENDED SAVINGS* $15,747 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $15,747
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,968
Cost:
$3,070
$1,968 38,687 - - $1,968
38,687
kWh
-
-
MMBtu
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,299
Cost:
$542
$1,299 13,482 - - $1,299
13,482
kWh
-
-
MMBtu
03: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$1,404
Cost:
$780
$1,404 15,533 - - $1,404
15,533
kWh
-
-
MMBtu
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$123
Cost:
$100
- - $123 18 -
-
kWh
$123
18
MMBtu
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$6,192
Cost:
$250
$6,192 60,961 - - $6,192
60,961
kWh
-
-
MMBtu
06: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$4,761
Cost:
-
$4,761 - - - $4,761
-
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$15,747
Cost:
$4,742
$15,624 128,663 $123 18 $15,624
128,663
kWh
$123
18
MMBtu
TOTAL IMPLEMENTED Savings:
$15,747
Cost:
$4,742
$15,624 128,663 $123 18 $15,624
128,663
kWh
$123
18
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas