IAC logo
IAC Assessment: AR0053
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AR0053
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Arkansas
Assessment Year 1995
Principal Product High Speed Drill Bits
NAICS n/a
SIC 3545 - Machine Tool Accessories
Sales $5,000,000-$10,000,000
# of Employees 88
Plant Area (Sq.Ft.) 82,000
Annual Production 6,500,000 Pieces
Production Hrs. Annual 6,017
Location (State) AR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $353,811 5,179,660 kWh $0.07
Natural Gas $14,112 3,270 MMBtu $4.32
TOTAL ENERGY COSTS $367,923
RECOMMENDED SAVINGS* $39,407 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $39,407
#|Description Savings
Cost
Status Electricity Usage Electricity Usage
$ kWh
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$9,048
Cost:
$1,548
$9,048 137,456 $9,048
137,456
kWh
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$4,527
Cost:
$200
$4,527 77,081 $4,527
77,081
kWh
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$8,253
Cost:
$10,970
$8,253 126,905 $8,253
126,905
kWh
04: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$916
Cost:
$90
$916 15,533 $916
15,533
kWh
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$115
Cost:
$100
$115 5,569 $115
5,569
kWh
06: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$16,548
Cost:
-
$16,548 - $16,548
-
kWh
TOTAL RECOMMENDED Savings:
$39,407
Cost:
$12,908
$39,407 362,544 $39,407
362,544
kWh
TOTAL IMPLEMENTED Savings:
$39,407
Cost:
$12,908
$39,407 362,544 $39,407
362,544
kWh
Savings
Cost
$ kWh
Electricity Usage Electricity Usage