Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Arkansas |
---|---|
Assessment Year | 1995 |
Principal Product | Custom Metal Stamping and Vending Machines |
NAICS | n/a |
SIC | 3469 - Metal Stampings, Nec |
Sales | $10,000,000-$50,000,000 |
# of Employees | 200 |
Plant Area (Sq.Ft.) | 270,000 |
Annual Production | 10,000 Pieces |
Production Hrs. Annual | 6,883 |
Location (State) | AR |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $278,879 | 5,355,510 | kWh | $0.05 |
Natural Gas | $206,854 | 69,546 | MMBtu | $2.97 |
TOTAL ENERGY COSTS | $524,177 | |||
RECOMMENDED SAVINGS* | $78,302 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $76,606 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Water Disposal | Ancillary Material Cost | Water Consumption | Electricity Usage | Natural Gas | Water Disposal | Ancillary Material Cost | Water Consumption | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | Tgal | $ | $ | $ | Tgal | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $4,396 Cost: $1,564 |
$4,396 | 73,857 | - | - | - | - | - | - | - | - |
$4,396 73,857 kWh |
- - MMBtu |
- - Tgal |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS |
Savings: $2,300 Cost: $2,790 |
$2,300 | 45,135 | - | - | - | - | - | - | - | - |
$2,300 45,135 kWh |
- - MMBtu |
- - Tgal |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $2,536 Cost: $5,120 |
$2,536 | 44,256 | - | - | - | - | - | - | - | - |
$2,536 44,256 kWh |
- - MMBtu |
- - Tgal |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $968 Cost: - |
$968 | 12,603 | - | - | - | - | - | - | - | - |
$968 12,603 kWh |
- - MMBtu |
- - Tgal |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $1,166 Cost: $200 |
$1,166 | 24,619 | - | - | - | - | - | - | - | - |
$1,166 24,619 kWh |
- - MMBtu |
- - Tgal |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $11,401 Cost: $300 |
$11,401 | 241,208 | - | - | - | - | - | - | - | - |
$11,401 241,208 kWh |
- - MMBtu |
- - Tgal |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.1116 IMPROVE COMBUSTION CONTROL CAPABILITY |
Savings: $53,202 Cost: $25,000 |
- | - | $53,202 | 17,913 | - | - | - | - | - | - |
- - kWh |
$53,202 17,913 MMBtu |
- - Tgal |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 3.4151 MINIMIZE WATER USAGE |
Savings: $637 Cost: $125 |
- | - | - | - | $328 | 2,066,688 | - | - | $309 | - |
- - kWh |
- - MMBtu |
$328 2,066,688 Tgal |
- - $ |
$309 - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 3.8314 PURCHASE HIGH MATERIALS IN RETURNABLE BULK CONTAINERS |
Savings: $1,696 Cost: - |
- | - | - | - | - | - | $1,696 | - | - | - |
- - kWh |
- - MMBtu |
- - Tgal |
$1,696 - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $78,302 Cost: $35,099 |
$22,767 | 441,678 | $53,202 | 17,913 | $328 | 2,066,688 | $1,696 | - | $309 | - | $22,767 441,678 kWh |
$53,202 17,913 MMBtu |
$328 2,066,688 Tgal |
$1,696 - $ |
$309 - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $76,606 Cost: $35,099 |
$22,767 | 441,678 | $53,202 | 17,913 | $328 | 2,066,688 | - | - | $309 | - | $22,767 441,678 kWh |
$53,202 17,913 MMBtu |
$328 2,066,688 Tgal |
- - $ |
$309 - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | Tgal | $ | $ | $ | Tgal | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Water Disposal | Ancillary Material Cost | Water Consumption | Electricity Usage | Natural Gas | Water Disposal | Ancillary Material Cost | Water Consumption |