IAC logo
IAC Assessment: AR0108
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AR0108
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Arkansas
Assessment Year 1997
Principal Product Frictional Horsepawer Motors
NAICS n/a
SIC 3621 - Motors And Generators
Sales $10,000,000-$50,000,000
# of Employees 210
Plant Area (Sq.Ft.) 80,000
Annual Production 36,000 Pieces
Production Hrs. Annual 6,674
Location (State) AR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $97,893 2,739,742 kWh $0.04
Electricity Demand $35,563 7,627 kW-months/year $4.66
Natural Gas $8,862 2,873 MMBtu $3.08
TOTAL ENERGY COSTS $156,402
RECOMMENDED SAVINGS* $133,140 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $130,235
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (non-haz) Primary Product Electricity Usage Electricity Demand Solid Waste (non-haz) Primary Product
$ kWh $ kW-months/year $ lb $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,303
Cost:
$415
$1,017 34,291 $286 61 - - - - $1,017
34,291
kWh
$286
61
kW-months/year
-
-
lb
-
-
$
02: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$560
Cost:
$186
$416 11,723 $144 31 - - - - $416
11,723
kWh
$144
31
kW-months/year
-
-
lb
-
-
$
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$622
Cost:
$270
$420 11,723 $202 15 - - - - $420
11,723
kWh
$202
15
kW-months/year
-
-
lb
-
-
$
04: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$469
Cost:
$1,050
$348 4,396 $121 19 - - - - $348
4,396
kWh
$121
19
kW-months/year
-
-
lb
-
-
$
05: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$274
Cost:
-
$187 5,275 $87 19 - - - - $187
5,275
kWh
$87
19
kW-months/year
-
-
lb
-
-
$
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$6,231
Cost:
$100
$5,054 140,973 $1,177 252 - - - - $5,054
140,973
kWh
$1,177
252
kW-months/year
-
-
lb
-
-
$
07: 2.3136 OVERLAP CUSTODIAL SERVICES WITH NORMAL DAY HOURS Savings:
$835
Cost:
$100
$835 23,154 - - - - - - $835
23,154
kWh
-
-
kW-months/year
-
-
lb
-
-
$
08: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$7,676
Cost:
-
- - - - $7,676 162,216 - - -
-
kWh
-
-
kW-months/year
$7,676
162,216
lb
-
-
$
09: 3.5311 RECOVER AND REUSE WASTE MATERIAL Savings:
$2,070
Cost:
$1,000
- - - - $2,070 900 - - -
-
kWh
-
-
kW-months/year
$2,070
900
lb
-
-
$
10: 4.112 REPLACE OLD MACHINE WITH NEW AUTOMATIC MULTI-STATION TOOL Savings:
$113,100
Cost:
$30,000
- - - - - - $113,100 - -
-
kWh
-
-
kW-months/year
-
-
lb
$113,100
-
$
TOTAL RECOMMENDED Savings:
$133,140
Cost:
$33,121
$8,277 231,535 $2,017 397 $9,746 163,116 $113,100 - $8,277
231,535
kWh
$2,017
397
kW-months/year
$9,746
163,116
lb
$113,100
-
$
TOTAL IMPLEMENTED Savings:
$130,235
Cost:
$32,021
$7,442 208,381 $2,017 397 $7,676 162,216 $113,100 - $7,442
208,381
kWh
$2,017
397
kW-months/year
$7,676
162,216
lb
$113,100
-
$
Savings
Cost
$ kWh $ kW-months/year $ lb $ $
Electricity Usage Electricity Demand Solid Waste (non-haz) Primary Product Electricity Usage Electricity Demand Solid Waste (non-haz) Primary Product