IAC logo
IAC Assessment: AR0110
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AR0110
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Arkansas
Assessment Year 1997
Principal Product Metal Storm Doors
NAICS n/a
SIC 3442 - Metal Doors, Sash, And Trim
Sales $10,000,000-$50,000,000
# of Employees 280
Plant Area (Sq.Ft.) 352,000
Annual Production 250,000 Pieces
Production Hrs. Annual 3,186
Location (State) AR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $178,348 5,456,917 kWh $0.03
Electricity Demand $220,330 16,272 kW-months/year $13.54
Natural Gas $115,521 37,716 MMBtu $3.06
TOTAL ENERGY COSTS $549,637
RECOMMENDED SAVINGS* $64,015 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $25,302
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (non-haz) Primary Raw Material Primary Product Electricity Usage Electricity Demand Solid Waste (non-haz) Primary Raw Material Primary Product
$ kWh $ kW-months/year $ lb $ $ $ $
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$3,096
Cost:
$4,230
$1,125 33,998 $1,971 146 - - - - - - $1,125
33,998
kWh
$1,971
146
kW-months/year
-
-
lb
-
-
$
-
-
$
02: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$604
Cost:
-
$207 6,155 $397 29 - - - - - - $207
6,155
kWh
$397
29
kW-months/year
-
-
lb
-
-
$
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,619
Cost:
$687
$632 19,050 $987 73 - - - - - - $632
19,050
kWh
$987
73
kW-months/year
-
-
lb
-
-
$
-
-
$
04: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$9,231
Cost:
$4,404
$3,432 104,045 $5,799 428 - - - - - - $3,432
104,045
kWh
$5,799
428
kW-months/year
-
-
lb
-
-
$
-
-
$
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$5,778
Cost:
$350
$3,568 41,032 $2,210 163 - - - - - - $3,568
41,032
kWh
$2,210
163
kW-months/year
-
-
lb
-
-
$
-
-
$
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$11,600
Cost:
$1,000
$4,788 136,870 $6,812 503 - - - - - - $4,788
136,870
kWh
$6,812
503
kW-months/year
-
-
lb
-
-
$
-
-
$
07: 2.3136 OVERLAP CUSTODIAL SERVICES WITH NORMAL DAY HOURS Savings:
$600
Cost:
$100
$600 18,171 - - - - - - - - $600
18,171
kWh
-
-
kW-months/year
-
-
lb
-
-
$
-
-
$
08: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$8,987
Cost:
-
- - - - $8,987 189,000 - - - - -
-
kWh
-
-
kW-months/year
$8,987
189,000
lb
-
-
$
-
-
$
09: 3.1162 USE LESS WASTEFUL PACKAGING Savings:
$10,000
Cost:
-
- - - - - - $10,000 - - - -
-
kWh
-
-
kW-months/year
-
-
lb
$10,000
-
$
-
-
$
10: 4.513 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS Savings:
$12,500
Cost:
$15,000
- - - - - - - - $12,500 - -
-
kWh
-
-
kW-months/year
-
-
lb
-
-
$
$12,500
-
$
TOTAL RECOMMENDED Savings:
$64,015
Cost:
$25,771
$14,352 359,321 $18,176 1,342 $8,987 189,000 $10,000 - $12,500 - $14,352
359,321
kWh
$18,176
1,342
kW-months/year
$8,987
189,000
lb
$10,000
-
$
$12,500
-
$
TOTAL IMPLEMENTED Savings:
$25,302
Cost:
$5,917
$6,545 189,918 $9,770 722 $8,987 189,000 - - - - $6,545
189,918
kWh
$9,770
722
kW-months/year
$8,987
189,000
lb
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ lb $ $ $ $
Electricity Usage Electricity Demand Solid Waste (non-haz) Primary Raw Material Primary Product Electricity Usage Electricity Demand Solid Waste (non-haz) Primary Raw Material Primary Product