IAC Assessment: AR0117
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AR0117
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Arkansas
Assessment Year 1997
Principal Product Signs
NAICS n/a
SIC 3993 - Signs And Advertising Specialities
Sales $10,000,000-$50,000,000
# of Employees 200
Plant Area (Sq.Ft.) 170,000
Annual Production 1,500,000 Pieces
Production Hrs. Annual 4,367
Location (State) AR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $55,154 1,436,401 kWh $0.04
Electricity Demand $57,921 4,144 kW-months/year $13.98
Natural Gas $26,281 4,948 MMBtu $5.31
TOTAL ENERGY COSTS $162,638
RECOMMENDED SAVINGS* $144,766 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $89,292
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Other Liquid (haz) Solid Waste (non-haz) Personnel Changes Electricity Usage Electricity Demand Other Liquid (haz) Solid Waste (non-haz) Personnel Changes
$ kWh $ kW-months/year $ gal $ lb $ $
01: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$741
Cost:
$250
$369 9,672 $372 27 - - - - - - $369
9,672
kWh
$372
27
kW-months/year
-
-
gal
-
-
lb
-
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$6,697
Cost:
$130
$3,330 87,632 $3,367 241 - - - - - - $3,330
87,632
kWh
$3,367
241
kW-months/year
-
-
gal
-
-
lb
-
-
$
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,002
Cost:
$1,830
$524 13,775 $478 34 - - - - - - $524
13,775
kWh
$478
34
kW-months/year
-
-
gal
-
-
lb
-
-
$
04: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$387
Cost:
-
$203 5,275 $184 13 - - - - - - $203
5,275
kWh
$184
13
kW-months/year
-
-
gal
-
-
lb
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,185
Cost:
$517
$626 16,413 $559 40 - - - - - - $626
16,413
kWh
$559
40
kW-months/year
-
-
gal
-
-
lb
-
-
$
06: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$487
Cost:
$420
$242 6,448 $245 18 - - - - - - $242
6,448
kWh
$245
18
kW-months/year
-
-
gal
-
-
lb
-
-
$
07: 2.3136 OVERLAP CUSTODIAL SERVICES WITH NORMAL DAY HOURS Savings:
$840
Cost:
$150
$840 22,274 - - - - - - - - $840
22,274
kWh
-
-
kW-months/year
-
-
gal
-
-
lb
-
-
$
08: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$12,784
Cost:
$8,000
- - - - - - $12,784 350,000 - - -
-
kWh
-
-
kW-months/year
-
-
gal
$12,784
350,000
lb
-
-
$
09: 3.8143 RECYCLE CLEANING SOLVENT AND REUSE Savings:
$4,637
Cost:
$6,150
- - - - $4,637 586 - - - - -
-
kWh
-
-
kW-months/year
$4,637
586
gal
-
-
lb
-
-
$
10: 4.4230 MOVE PRODUCT USING MECHANICAL MEANS Savings:
$75,030
Cost:
$60,000
$(-54) (-586) - - - - - - $75,084 - $(-54)
(-586)
kWh
-
-
kW-months/year
-
-
gal
-
-
lb
$75,084
-
$
11: 4.4230 MOVE PRODUCT USING MECHANICAL MEANS Savings:
$40,976
Cost:
$54,000
- - - - - - - - $40,976 - -
-
kWh
-
-
kW-months/year
-
-
gal
-
-
lb
$40,976
-
$
TOTAL RECOMMENDED Savings:
$144,766
Cost:
$131,447
$6,080 160,903 $5,205 373 $4,637 586 $12,784 350,000 $116,060 - $6,080
160,903
kWh
$5,205
373
kW-months/year
$4,637
586
gal
$12,784
350,000
lb
$116,060
-
$
TOTAL IMPLEMENTED Savings:
$89,292
Cost:
$68,877
$4,795 126,906 $4,776 342 $4,637 586 - - $75,084 - $4,795
126,906
kWh
$4,776
342
kW-months/year
$4,637
586
gal
-
-
lb
$75,084
-
$
Savings
Cost
$ kWh $ kW-months/year $ gal $ lb $ $
Electricity Usage Electricity Demand Other Liquid (haz) Solid Waste (non-haz) Personnel Changes Electricity Usage Electricity Demand Other Liquid (haz) Solid Waste (non-haz) Personnel Changes