Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Arkansas |
---|---|
Assessment Year | 1997 |
Principal Product | Ladies Casual and Dress Shoes |
NAICS | n/a |
SIC | 3144 - Women's Footwear, Except Athletic |
Sales | $1,000,000-$5,000,000 |
# of Employees | 265 |
Plant Area (Sq.Ft.) | 30,000 |
Annual Production | 138,000 Pieces |
Production Hrs. Annual | 2,000 |
Location (State) | AR |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $45,754 | 1,298,066 | kWh | $0.04 |
Electricity Demand | $61,597 | 4,407 | kW-months/year | $13.98 |
Natural Gas | $7,537 | 1,508 | MMBtu | $5.00 |
TOTAL ENERGY COSTS | $121,383 | |||
RECOMMENDED SAVINGS* | $101,385 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $3,853 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Water Disposal | Solid Waste (non-haz) | Personnel Changes | Electricity Usage | Electricity Demand | Water Disposal | Solid Waste (non-haz) | Personnel Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | Tgal | $ | lb | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $562 Cost: $234 |
$216 | 6,155 | $346 | 25 | - | - | - | - | - | - |
$216 6,155 kWh |
$346 25 kW-months/year |
- - Tgal |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS |
Savings: $559 Cost: $402 |
$210 | 5,862 | $349 | 25 | - | - | - | - | - | - |
$210 5,862 kWh |
$349 25 kW-months/year |
- - Tgal |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $33 Cost: $95 |
$10 | 293 | $23 | 2 | - | - | - | - | - | - |
$10 293 kWh |
$23 2 kW-months/year |
- - Tgal |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $107 Cost: - |
$32 | 879 | $75 | 5 | - | - | - | - | - | - |
$32 879 kWh |
$75 5 kW-months/year |
- - Tgal |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $1,845 Cost: $220 |
$543 | 15,533 | $1,302 | 93 | - | - | - | - | - | - |
$543 15,533 kWh |
$1,302 93 kW-months/year |
- - Tgal |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $136 Cost: $60 |
$40 | 1,172 | $96 | 7 | - | - | - | - | - | - |
$40 1,172 kWh |
$96 7 kW-months/year |
- - Tgal |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME |
Savings: $110 Cost: $100 |
$110 | 3,224 | - | - | - | - | - | - | - | - |
$110 3,224 kWh |
- - kW-months/year |
- - Tgal |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.7314 REDUCE VENTILATION AIR |
Savings: $1,309 Cost: $400 |
$1,309 | 71,805 | - | - | - | - | - | - | - | - |
$1,309 71,805 kWh |
- - kW-months/year |
- - Tgal |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 3.4115 RECOVER AND REUSE COOLING WATER |
Savings: $1,536 Cost: $3,400 |
- | - | - | - | $1,536 | 480,300 | - | - | - | - |
- - kWh |
- - kW-months/year |
$1,536 480,300 Tgal |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 3.1192 REDUCE SCRAP PRODUCTION |
Savings: $14,060 Cost: $3,000 |
- | - | - | - | - | - | $4,700 | 15,500 | $9,360 | - |
- - kWh |
- - kW-months/year |
- - Tgal |
$4,700 15,500 lb |
$9,360 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 4.514 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS |
Savings: $55,352 Cost: $355,000 |
$(-808) | (-6,741) | - | - | - | - | - | - | $56,160 | - |
$(-808) (-6,741) kWh |
- - kW-months/year |
- - Tgal |
- - lb |
$56,160 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
12: 4.515 INSTALL SHELVES / RACKS TO UTILIZE UNUSED SPACE |
Savings: $25,776 Cost: $16,800 |
- | - | - | - | - | - | $10,800 | 4,500 | $14,976 | - |
- - kWh |
- - kW-months/year |
- - Tgal |
$10,800 4,500 lb |
$14,976 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $101,385 Cost: $379,711 |
$1,662 | 98,182 | $2,191 | 157 | $1,536 | 480,300 | $15,500 | 20,000 | $80,496 | - | $1,662 98,182 kWh |
$2,191 157 kW-months/year |
$1,536 480,300 Tgal |
$15,500 20,000 lb |
$80,496 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $3,853 Cost: $1,117 |
$2,104 | 94,372 | $1,749 | 125 | - | - | - | - | - | - | $2,104 94,372 kWh |
$1,749 125 kW-months/year |
- - Tgal |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | Tgal | $ | lb | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Water Disposal | Solid Waste (non-haz) | Personnel Changes | Electricity Usage | Electricity Demand | Water Disposal | Solid Waste (non-haz) | Personnel Changes |