IAC logo
IAC Assessment: AR0126
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AR0126
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Arkansas
Assessment Year 1997
Principal Product Ladies Casual and Dress Shoes
NAICS n/a
SIC 3144 - Women's Footwear, Except Athletic
Sales $1,000,000-$5,000,000
# of Employees 265
Plant Area (Sq.Ft.) 30,000
Annual Production 138,000 Pieces
Production Hrs. Annual 2,000
Location (State) AR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $45,754 1,298,066 kWh $0.04
Electricity Demand $61,597 4,407 kW-months/year $13.98
Natural Gas $7,537 1,508 MMBtu $5.00
TOTAL ENERGY COSTS $121,383
RECOMMENDED SAVINGS* $101,385 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $3,853
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Water Disposal Solid Waste (non-haz) Personnel Changes Electricity Usage Electricity Demand Water Disposal Solid Waste (non-haz) Personnel Changes
$ kWh $ kW-months/year $ Tgal $ lb $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$562
Cost:
$234
$216 6,155 $346 25 - - - - - - $216
6,155
kWh
$346
25
kW-months/year
-
-
Tgal
-
-
lb
-
-
$
02: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$559
Cost:
$402
$210 5,862 $349 25 - - - - - - $210
5,862
kWh
$349
25
kW-months/year
-
-
Tgal
-
-
lb
-
-
$
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$33
Cost:
$95
$10 293 $23 2 - - - - - - $10
293
kWh
$23
2
kW-months/year
-
-
Tgal
-
-
lb
-
-
$
04: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$107
Cost:
-
$32 879 $75 5 - - - - - - $32
879
kWh
$75
5
kW-months/year
-
-
Tgal
-
-
lb
-
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,845
Cost:
$220
$543 15,533 $1,302 93 - - - - - - $543
15,533
kWh
$1,302
93
kW-months/year
-
-
Tgal
-
-
lb
-
-
$
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$136
Cost:
$60
$40 1,172 $96 7 - - - - - - $40
1,172
kWh
$96
7
kW-months/year
-
-
Tgal
-
-
lb
-
-
$
07: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$110
Cost:
$100
$110 3,224 - - - - - - - - $110
3,224
kWh
-
-
kW-months/year
-
-
Tgal
-
-
lb
-
-
$
08: 2.7314 REDUCE VENTILATION AIR Savings:
$1,309
Cost:
$400
$1,309 71,805 - - - - - - - - $1,309
71,805
kWh
-
-
kW-months/year
-
-
Tgal
-
-
lb
-
-
$
09: 3.4115 RECOVER AND REUSE COOLING WATER Savings:
$1,536
Cost:
$3,400
- - - - $1,536 480,300 - - - - -
-
kWh
-
-
kW-months/year
$1,536
480,300
Tgal
-
-
lb
-
-
$
10: 3.1192 REDUCE SCRAP PRODUCTION Savings:
$14,060
Cost:
$3,000
- - - - - - $4,700 15,500 $9,360 - -
-
kWh
-
-
kW-months/year
-
-
Tgal
$4,700
15,500
lb
$9,360
-
$
11: 4.514 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS Savings:
$55,352
Cost:
$355,000
$(-808) (-6,741) - - - - - - $56,160 - $(-808)
(-6,741)
kWh
-
-
kW-months/year
-
-
Tgal
-
-
lb
$56,160
-
$
12: 4.515 INSTALL SHELVES / RACKS TO UTILIZE UNUSED SPACE Savings:
$25,776
Cost:
$16,800
- - - - - - $10,800 4,500 $14,976 - -
-
kWh
-
-
kW-months/year
-
-
Tgal
$10,800
4,500
lb
$14,976
-
$
TOTAL RECOMMENDED Savings:
$101,385
Cost:
$379,711
$1,662 98,182 $2,191 157 $1,536 480,300 $15,500 20,000 $80,496 - $1,662
98,182
kWh
$2,191
157
kW-months/year
$1,536
480,300
Tgal
$15,500
20,000
lb
$80,496
-
$
TOTAL IMPLEMENTED Savings:
$3,853
Cost:
$1,117
$2,104 94,372 $1,749 125 - - - - - - $2,104
94,372
kWh
$1,749
125
kW-months/year
-
-
Tgal
-
-
lb
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ Tgal $ lb $ $
Electricity Usage Electricity Demand Water Disposal Solid Waste (non-haz) Personnel Changes Electricity Usage Electricity Demand Water Disposal Solid Waste (non-haz) Personnel Changes