IAC Assessment: AR0128
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AR0128
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Arkansas
Assessment Year 1997
Principal Product Men's Shoes and Boots
NAICS n/a
SIC 3143 - Men's Footwear, Except Athletic
Sales $10,000,000-$50,000,000
# of Employees 490
Plant Area (Sq.Ft.) 150,000
Annual Production 970,000 Pieces
Production Hrs. Annual 2,125
Location (State) AR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $213,193 2,863,716 kWh $0.07
Electricity Demand $39,335 10,423 kW-months/year $3.77
Natural Gas $17,225 3,198 MMBtu $5.39
TOTAL ENERGY COSTS $299,742
RECOMMENDED SAVINGS* $230,611 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $171,023
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Primary Product Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Primary Product
$ kWh $ kW-months/year $ lb $ $ $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$627
Cost:
-
$487 6,448 $140 37 - - - - - - $487
6,448
kWh
$140
37
kW-months/year
-
-
lb
-
-
$
-
-
$
02: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$2,309
Cost:
$278
$1,778 24,033 $531 141 - - - - - - $1,778
24,033
kWh
$531
141
kW-months/year
-
-
lb
-
-
$
-
-
$
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$754
Cost:
$420
$586 7,913 $168 45 - - - - - - $586
7,913
kWh
$168
45
kW-months/year
-
-
lb
-
-
$
-
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,279
Cost:
$370
$2,546 34,291 $733 194 - - - - - - $2,546
34,291
kWh
$733
194
kW-months/year
-
-
lb
-
-
$
-
-
$
05: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$88
Cost:
$1,230
$68 879 $20 5 - - - - - - $68
879
kWh
$20
5
kW-months/year
-
-
lb
-
-
$
-
-
$
06: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$954
Cost:
$402
$954 12,896 - - - - - - - - $954
12,896
kWh
-
-
kW-months/year
-
-
lb
-
-
$
-
-
$
07: 3.1192 REDUCE SCRAP PRODUCTION Savings:
$22,337
Cost:
$4,500
- - - - $11,000 35,000 - - $11,337 - -
-
kWh
-
-
kW-months/year
$11,000
35,000
lb
-
-
$
$11,337
-
$
08: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$3,245
Cost:
-
$(-76) (-293) - - $3,593 92,000 $(-272) - - - $(-76)
(-293)
kWh
-
-
kW-months/year
$3,593
92,000
lb
$(-272)
-
$
-
-
$
09: 4.514 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS Savings:
$161,348
Cost:
$400,000
$(-1,215) (-12,896) - - - - $162,563 - - - $(-1,215)
(-12,896)
kWh
-
-
kW-months/year
-
-
lb
$162,563
-
$
-
-
$
10: 4.515 INSTALL SHELVES / RACKS TO UTILIZE UNUSED SPACE Savings:
$35,670
Cost:
$21,000
- - - - $12,996 5,415 $22,674 - - - -
-
kWh
-
-
kW-months/year
$12,996
5,415
lb
$22,674
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$230,611
Cost:
$428,200
$5,128 73,271 $1,592 422 $27,589 132,415 $184,965 - $11,337 - $5,128
73,271
kWh
$1,592
422
kW-months/year
$27,589
132,415
lb
$184,965
-
$
$11,337
-
$
TOTAL IMPLEMENTED Savings:
$171,023
Cost:
$402,298
$3,687 53,927 $1,452 385 $3,593 92,000 $162,291 - - - $3,687
53,927
kWh
$1,452
385
kW-months/year
$3,593
92,000
lb
$162,291
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ lb $ $ $ $
Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Primary Product Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Primary Product