Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Arkansas |
---|---|
Assessment Year | 1999 |
Principal Product | Aluminum extrusions |
NAICS | n/a |
SIC | 3356 - Nonferrous Rolling And Drawing, Nec |
Sales | $10,000,000-$50,000,000 |
# of Employees | 45 |
Plant Area (Sq.Ft.) | 96,200 |
Annual Production | 12,000,000 Pounds |
Production Hrs. Annual | 6,022 |
Location (State) | AR |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $93,647 | 2,730,950 | kWh | $0.03 |
Electricity Demand | $68,107 | 9,606 | kW-months/year | $7.09 |
Natural Gas | $13,685 | 2,831 | MMBtu | $4.83 |
TOTAL ENERGY COSTS | $175,439 | |||
RECOMMENDED SAVINGS* | $253,431 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $133,383 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Personnel Changes | Water Consumption | Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Personnel Changes | Water Consumption | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | lb | $ | $ | $ | Tgal | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $2,689 Cost: $3,628 |
$1,877 | 55,100 | $812 | 115 | - | - | - | - | - | - |
$1,877 55,100 kWh |
$812 115 kW-months/year |
- - lb |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $272 Cost: $1,750 |
$221 | 2,931 | $51 | 7 | - | - | - | - | - | - |
$221 2,931 kWh |
$51 7 kW-months/year |
- - lb |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $1,374 Cost: $50 |
$1,080 | 23,154 | $294 | 41 | - | - | - | - | - | - |
$1,080 23,154 kWh |
$294 41 kW-months/year |
- - lb |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $1,246 Cost: $450 |
$981 | 21,102 | $265 | 37 | - | - | - | - | - | - |
$981 21,102 kWh |
$265 37 kW-months/year |
- - lb |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 3.4111 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION |
Savings: $9,048 Cost: $5,000 |
$(-5,105) | (-150,059) | $(-4,333) | (-611) | - | - | - | - | $18,486 | - |
$(-5,105) (-150,059) kWh |
$(-4,333) (-611) kW-months/year |
- - lb |
- - $ |
$18,486 - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 3.1192 REDUCE SCRAP PRODUCTION |
Savings: $120,000 Cost: $80,000 |
- | - | - | - | $120,000 | 120,000 | - | - | - | - |
- - kWh |
- - kW-months/year |
$120,000 120,000 lb |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 4.513 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS |
Savings: $118,802 Cost: $300 |
- | - | - | - | - | - | $118,802 | - | - | - |
- - kWh |
- - kW-months/year |
- - lb |
$118,802 - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $253,431 Cost: $91,178 |
$(-946) | (-47,772) | $(-2,911) | (-411) | $120,000 | 120,000 | $118,802 | - | $18,486 | - | $(-946) (-47,772) kWh |
$(-2,911) (-411) kW-months/year |
$120,000 120,000 lb |
$118,802 - $ |
$18,486 - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $133,383 Cost: $90,428 |
$(-1,927) | (-68,874) | $(-3,176) | (-448) | $120,000 | 120,000 | - | - | $18,486 | - | $(-1,927) (-68,874) kWh |
$(-3,176) (-448) kW-months/year |
$120,000 120,000 lb |
- - $ |
$18,486 - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | lb | $ | $ | $ | Tgal | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Personnel Changes | Water Consumption | Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Personnel Changes | Water Consumption |