IAC logo
IAC Assessment: AS0104
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AS0104
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Arizona State University
Assessment Year 1993
Principal Product PORTLAND CEMENT
NAICS n/a
SIC 3241 - Cement, Hydraulic
Sales $50,000,000-$100,000,000
# of Employees 145
Plant Area (Sq.Ft.) 0
Annual Production 1,500,000 Tons
Production Hrs. Annual 8,736
Location (State) AZ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $6,942,370 104,315,359 kWh $0.07
Natural Gas $277,507 62,691 MMBtu $4.43
Coal $3,442,583 2,063,542 MMBtu $1.67
Other Energy $137,034 103,211 MMBtu $1.33
TOTAL ENERGY COSTS $10,799,494
RECOMMENDED SAVINGS* $402,780 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,027
Cost:
-
$1,248 18,757 - - $(-221) - $1,248
18,757
kWh
-
-
MMBtu
$(-221)
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,926
Cost:
$3,600
$1,926 29,015 - - - - $1,926
29,015
kWh
-
-
MMBtu
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$580
Cost:
$369
$580 8,792 - - - - $580
8,792
kWh
-
-
MMBtu
-
-
$
04: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,134
Cost:
$1,021
$1,134 16,999 - - - - $1,134
16,999
kWh
-
-
MMBtu
-
-
$
05: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$9,642
Cost:
-
$9,642 144,783 - - - - $9,642
144,783
kWh
-
-
MMBtu
-
-
$
06: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$6,448
Cost:
$7,084
$6,448 97,011 - - - - $6,448
97,011
kWh
-
-
MMBtu
-
-
$
07: 2.3192 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS Savings:
$382,023
Cost:
$1,218,600
$1,044,071 17,791,618 $(-751,006) (-169,479) $88,958 - $1,044,071
17,791,618
kWh
$(-751,006)
(-169,479)
MMBtu
$88,958
-
$
TOTAL RECOMMENDED Savings:
$402,780
Cost:
$1,230,674
$1,065,049 18,106,975 $(-751,006) (-169,479) $88,737 - $1,065,049
18,106,975
kWh
$(-751,006)
(-169,479)
MMBtu
$88,737
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes