IAC logo
IAC Assessment: AS0143
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AS0143
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Arizona State University
Assessment Year 1995
Principal Product Anodizing and Polishing
NAICS n/a
SIC 3471 - Plating And Polishing
Sales $1,000,000-$5,000,000
# of Employees 97
Plant Area (Sq.Ft.) 65,000
Annual Production 25,900,000 Thousand Feet
Production Hrs. Annual 5,200
Location (State) AZ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $276,427 3,166,471 kWh $0.09
Natural Gas $104,024 21,165 MMBtu $4.91
TOTAL ENERGY COSTS $380,451
RECOMMENDED SAVINGS* $48,312 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $43,480
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$9,285
Cost:
$17,600
$9,285 131,887 - - $9,285
131,887
kWh
-
-
MMBtu
02: 2.2622 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL Savings:
$13,244
Cost:
$60,000
$13,244 184,349 - - $13,244
184,349
kWh
-
-
MMBtu
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$6,764
Cost:
$5,461
$6,764 89,977 - - $6,764
89,977
kWh
-
-
MMBtu
04: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$1,544
Cost:
-
$1,544 20,223 - - $1,544
20,223
kWh
-
-
MMBtu
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,823
Cost:
$500
$1,823 33,118 - - $1,823
33,118
kWh
-
-
MMBtu
06: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$349
Cost:
$599
- - $349 71 -
-
kWh
$349
71
MMBtu
07: 2.2511 INSULATE BARE EQUIPMENT Savings:
$8,829
Cost:
$10,900
- - $8,829 1,798 -
-
kWh
$8,829
1,798
MMBtu
08: 2.2121 INCREASE AMOUNT OF CONDENSATE RETURNED Savings:
$4,832
Cost:
$10,100
- - $4,832 984 -
-
kWh
$4,832
984
MMBtu
09: 2.1133 ADJUST BURNERS FOR EFFICIENT OPERATION Savings:
$1,479
Cost:
$2,000
- - $1,479 301 -
-
kWh
$1,479
301
MMBtu
10: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$163
Cost:
$115
$163 2,931 - - $163
2,931
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$48,312
Cost:
$107,275
$32,823 462,485 $15,489 3,154 $32,823
462,485
kWh
$15,489
3,154
MMBtu
TOTAL IMPLEMENTED Savings:
$43,480
Cost:
$97,175
$32,823 462,485 $10,657 2,170 $32,823
462,485
kWh
$10,657
2,170
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas