IAC Assessment: AS0203
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AS0203
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Arizona State University
Assessment Year 1997
Principal Product Integrated Circuits
NAICS n/a
SIC 3674 - Semiconductors And Related Devices
Sales $1,000,000-$5,000,000
# of Employees 350
Plant Area (Sq.Ft.) 101,947
Annual Production 25,000 Pieces
Production Hrs. Annual 8,400
Location (State) AZ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $325,064 6,452,228 kWh $0.05
Electricity Demand $29,708 10,860 kW-months/year $2.74
Electricity Fees $25,645 - $ -
Natural Gas $16,543 3,239 MMBtu $5.11
TOTAL ENERGY COSTS $403,360
RECOMMENDED SAVINGS* $118,932 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $112,016
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Water Disposal Administrative Changes Electricity Usage Electricity Demand Water Disposal Administrative Changes
$ kWh $ kW-months/year $ Tgal $ $
01: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$312
Cost:
-
$134 3,517 $178 16 - - - - $134
3,517
kWh
$178
16
kW-months/year
-
-
Tgal
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$861
Cost:
$570
$619 16,120 $242 22 - - - - $619
16,120
kWh
$242
22
kW-months/year
-
-
Tgal
-
-
$
03: 2.1121 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING Savings:
$393
Cost:
$300
$280 7,327 $113 10 - - - - $280
7,327
kWh
$113
10
kW-months/year
-
-
Tgal
-
-
$
04: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$3,343
Cost:
$3,980
$2,602 67,409 $741 67 - - - - $2,602
67,409
kWh
$741
67
kW-months/year
-
-
Tgal
-
-
$
05: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$188
Cost:
-
$135 3,517 $53 5 - - - - $135
3,517
kWh
$53
5
kW-months/year
-
-
Tgal
-
-
$
06: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS Savings:
$1,880
Cost:
$1,880
- - - - $1,880 195,632 - - -
-
kWh
-
-
kW-months/year
$1,880
195,632
Tgal
-
-
$
07: 3.4151 MINIMIZE WATER USAGE Savings:
$800
Cost:
-
- - - - $800 394,200 - - -
-
kWh
-
-
kW-months/year
$800
394,200
Tgal
-
-
$
08: 4.811 DEMOLISH OLD BUILDING TO REDUCE TAX AND INSURANCE BILLS Savings:
$1,460
Cost:
$75
- - - - - - $1,460 - -
-
kWh
-
-
kW-months/year
-
-
Tgal
$1,460
-
$
09: 4.512 CONDENSE OPERATION INTO ONE BUILDING Savings:
$109,695
Cost:
$15,000
$8,822 228,605 $12,188 1,108 - - $88,685 - $8,822
228,605
kWh
$12,188
1,108
kW-months/year
-
-
Tgal
$88,685
-
$
TOTAL RECOMMENDED Savings:
$118,932
Cost:
$21,805
$12,592 326,495 $13,515 1,228 $2,680 589,832 $90,145 - $12,592
326,495
kWh
$13,515
1,228
kW-months/year
$2,680
589,832
Tgal
$90,145
-
$
TOTAL IMPLEMENTED Savings:
$112,016
Cost:
$15,645
$9,441 244,725 $12,430 1,130 - - $90,145 - $9,441
244,725
kWh
$12,430
1,130
kW-months/year
-
-
Tgal
$90,145
-
$
Savings
Cost
$ kWh $ kW-months/year $ Tgal $ $
Electricity Usage Electricity Demand Water Disposal Administrative Changes Electricity Usage Electricity Demand Water Disposal Administrative Changes