Select a Center

Arizona State University
Boise State University
Case Western Reserve University
Clemson University
Colorado State University
Georgia Institute of Technology
Indiana University-Purdue University
Lehigh University
Louisiana State University
North Carolina State
Oklahoma State University
Oregon State University
San Diego State University
San Francisco State University
Syracuse University
Tennessee Technological University
Texas A&M, College Station
University of Alabama
University of Dayton
University of Delaware
University of Florida
University of Illinois, Chicago
University of Kentucky
University of Massachusetts
University of Miami
University of Missouri-Columbia
University of Nebraska–Lincoln
University of Texas Rio Grande Valley
University of Utah
University of Wisconsin, Milwaukee
West Virginia University
IAC logo
IAC Assessment: AS0370
Sponsored by:
EERE AMO
IAC logo
IAC Assessment: AS0370
IAC Center Arizona State University
Assessment Year 2004
Principal Product Printed Circuit Boards
NAICS 334412 - Bare Printed Circuit Board Manufacturing
SIC 3672 - Printed Circuit Boards
Sales $85,000,000
# of Employees 720
Plant Area (Sq.Ft.) 275,000
Annual Production 208,000 Pieces
Production Hrs. Annual 7,488
Location (State) AZ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,149,844 18,970,166 kWh $0.06
Electricity Fees $9,223 - $ -
Natural Gas $9,223 952 MMBtu $9.69
TOTAL ENERGY COSTS $1,817,687
RECOMMENDED SAVINGS* $64,594 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Usage Electricity Demand
$ kWh $ kW-months/year
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$20,289
Cost:
$150
$12,448 365,071 $7,841 586 $12,448
365,071
kWh
$7,841
586
kW-months/year
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$14,258
Cost:
$39,378
$9,490 229,481 $4,768 444 $9,490
229,481
kWh
$4,768
444
kW-months/year
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$15,336
Cost:
$12,650
$9,413 276,035 $5,923 444 $9,413
276,035
kWh
$5,923
444
kW-months/year
04: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$10,545
Cost:
$16,000
$4,614 118,562 $5,931 517 $4,614
118,562
kWh
$5,931
517
kW-months/year
05: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$2,794
Cost:
$1,844
$2,327 45,194 $467 72 $2,327
45,194
kWh
$467
72
kW-months/year
06: 2.4323 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT Savings:
$1,372
Cost:
$5,500
$1,203 21,715 $169 35 $1,203
21,715
kWh
$169
35
kW-months/year
TOTAL RECOMMENDED Savings:
$64,594
Cost:
$75,522
$39,495 1,056,058 $25,099 2,098 $39,495
1,056,058
kWh
$25,099
2,098
kW-months/year
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - -
-
kWh
-
-
kW-months/year
Savings
Cost
$ kWh $ kW-months/year
Electricity Usage Electricity Demand Electricity Usage Electricity Demand