IAC logo
IAC Assessment: AS0370
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AS0370
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Arizona State University
Assessment Year 2004
Principal Product Printed Circuit Boards
NAICS 334412 - Bare Printed Circuit Board Manufacturing
SIC 3672 - Printed Circuit Boards
Sales $50,000,000-$100,000,000
# of Employees 720
Plant Area (Sq.Ft.) 275,000
Annual Production 208,000 Pieces
Production Hrs. Annual 7,488
Location (State) AZ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,149,844 18,970,166 kWh $0.06
Electricity Fees $9,223 - $ -
Natural Gas $9,223 952 MMBtu $9.69
TOTAL ENERGY COSTS $1,817,687
RECOMMENDED SAVINGS* $64,594 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Usage Electricity Demand
$ kWh $ kW-months/year
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$20,289
Cost:
$150
$12,448 365,071 $7,841 586 $12,448
365,071
kWh
$7,841
586
kW-months/year
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$14,258
Cost:
$39,378
$9,490 229,481 $4,768 444 $9,490
229,481
kWh
$4,768
444
kW-months/year
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$15,336
Cost:
$12,650
$9,413 276,035 $5,923 444 $9,413
276,035
kWh
$5,923
444
kW-months/year
04: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$10,545
Cost:
$16,000
$4,614 118,562 $5,931 517 $4,614
118,562
kWh
$5,931
517
kW-months/year
05: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$2,794
Cost:
$1,844
$2,327 45,194 $467 72 $2,327
45,194
kWh
$467
72
kW-months/year
06: 2.4323 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT Savings:
$1,372
Cost:
$5,500
$1,203 21,715 $169 35 $1,203
21,715
kWh
$169
35
kW-months/year
TOTAL RECOMMENDED Savings:
$64,594
Cost:
$75,522
$39,495 1,056,058 $25,099 2,098 $39,495
1,056,058
kWh
$25,099
2,098
kW-months/year
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - -
-
kWh
-
-
kW-months/year
Savings
Cost
$ kWh $ kW-months/year
Electricity Usage Electricity Demand Electricity Usage Electricity Demand