IAC logo
IAC Assessment: AS0478
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AS0478
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Arizona State University
Assessment Year 2019
Principal Product Cement/Ready Mix
NAICS 327320 - Ready-Mix Concrete Manufacturing
SIC 3273 - Ready-mixed Concrete
Sales $10,000,000-$50,000,000
# of Employees 15
Plant Area (Sq.Ft.) 2,000
Annual Production 6,000 Units
Production Hrs. Annual 3,333
Location (State) AZ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $26,989 341,200 kWh $0.08
Electricity Demand $71,194 4,388 kW-months/year $16.22
Electricity Fees $7,659 - $ -
TOTAL ENERGY COSTS $105,842
RECOMMENDED SAVINGS* $65,851 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $28,283
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Administrative Changes Electricity Usage Electricity Demand Administrative Changes
$ kWh $ kW-months/year $ $
01: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$25,716
Cost:
$2,242
- - - - $25,716 - -
-
kWh
-
-
kW-months/year
$25,716
-
$
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$16,212
Cost:
$45,350
$12,627 126,265 $3,585 455 - - $12,627
126,265
kWh
$3,585
455
kW-months/year
-
-
$
03: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$13,813
Cost:
$447
$12,379 123,785 $1,434 182 - - $12,379
123,785
kWh
$1,434
182
kW-months/year
-
-
$
04: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$7,543
Cost:
$27,245
$6,417 64,167 $1,126 143 - - $6,417
64,167
kWh
$1,126
143
kW-months/year
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,567
Cost:
$2,918
$2,000 19,998 $567 72 - - $2,000
19,998
kWh
$567
72
kW-months/year
-
-
$
TOTAL RECOMMENDED Savings:
$65,851
Cost:
$78,202
$33,423 334,215 $6,712 852 $25,716 - $33,423
334,215
kWh
$6,712
852
kW-months/year
$25,716
-
$
TOTAL IMPLEMENTED Savings:
$28,283
Cost:
$5,160
$2,000 19,998 $567 72 $25,716 - $2,000
19,998
kWh
$567
72
kW-months/year
$25,716
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Administrative Changes Electricity Usage Electricity Demand Administrative Changes