IAC Assessment: AS0503
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AS0503
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Arizona State University
Assessment Year 2021
Principal Product Potable Water
NAICS 221310 - Water Supply and Irrigation Systems
SIC 4941 - Water Supply
Sales <$500,000
# of Employees 37
Plant Area (Sq.Ft.) 2,400,000
Annual Production 14,700,000 Thousand Gallons
Production Hrs. Annual 7,656
Location (State) AZ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,060,409 18,049,877 kWh $0.06
Electricity Demand $363,972 38,616 kW-months/year $9.43
Electricity Fees $140,147 - $ -
TOTAL ENERGY COSTS $1,564,528
RECOMMENDED SAVINGS* $516,487 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $431,439
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Ancillary Material Cost One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Ancillary Material Cost One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ $ $ $
01: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$316,547
Cost:
$4,413,360
$267,990 4,231,318 $48,557 5,850 - - - - $267,990
4,231,318
kWh
$48,557
5,850
kW-months/year
-
-
$
-
-
$
02: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$82,856
Cost:
$1,837
$47,223 - $35,633 - - - - - $47,223
-
kWh
$35,633
-
kW-months/year
-
-
$
-
-
$
03: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS Savings:
$35,467
Cost:
$918
$14,041 237,983 - - $(-8,638) - $30,064 - $14,041
237,983
kWh
-
-
kW-months/year
$(-8,638)
-
$
$30,064
-
$
04: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$27,634
Cost:
$115
- - $9,200 - - - $18,434 - -
-
kWh
$9,200
-
kW-months/year
-
-
$
$18,434
-
$
05: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS Savings:
$25,372
Cost:
$918
$21,262 360,380 $4,110 494 - - - - $21,262
360,380
kWh
$4,110
494
kW-months/year
-
-
$
-
-
$
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$9,834
Cost:
$5,555
$8,239 139,642 $1,595 191 - - - - $8,239
139,642
kWh
$1,595
191
kW-months/year
-
-
$
-
-
$
07: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$9,147
Cost:
$2,290
$9,147 155,037 - - - - - - $9,147
155,037
kWh
-
-
kW-months/year
-
-
$
-
-
$
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$7,438
Cost:
$14,828
$6,068 102,709 $1,003 120 - - $367 - $6,068
102,709
kWh
$1,003
120
kW-months/year
-
-
$
$367
-
$
09: 2.7272 INSTALL HEAT PIPES / RAISE COOLING SETPOINT Savings:
$2,192
Cost:
$434
$1,527 25,885 $665 80 - - - - $1,527
25,885
kWh
$665
80
kW-months/year
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$516,487
Cost:
$4,440,255
$375,497 5,252,954 $100,763 6,735 $(-8,638) - $48,865 - $375,497
5,252,954
kWh
$100,763
6,735
kW-months/year
$(-8,638)
-
$
$48,865
-
$
TOTAL IMPLEMENTED Savings:
$431,439
Cost:
$4,437,984
$326,747 5,227,069 $64,465 6,655 $(-8,638) - $48,865 - $326,747
5,227,069
kWh
$64,465
6,655
kW-months/year
$(-8,638)
-
$
$48,865
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $
Electricity Usage Electricity Demand Ancillary Material Cost One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Ancillary Material Cost One-time Revenue or Avoided Cost