IAC Assessment: AS0599
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AS0599
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Arizona State University
Assessment Year 2025
Principal Product Sand
NAICS 212321 - Construction Sand and Gravel Mining
SIC 1442 - Construction Sand And Gravel
Sales $10,000,000-$50,000,000
# of Employees 80
Plant Area (Sq.Ft.) 400,000
Annual Production 8,760,000 Tons
Production Hrs. Annual 8,712
Location (State) AZ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,901,578 9,664,836 kWh $0.20
Electricity Demand $84,871 19,416 kW-months/year $4.37
Electricity Fees $104,902 - $ -
LPG $1,565,908 131,557 MMBtu $11.90
TOTAL ENERGY COSTS $3,657,259
RECOMMENDED SAVINGS* $1,715,848 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas LPG Fuel Oil #1 Personnel Changes Ancillary Material Cost One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas LPG Fuel Oil #1 Personnel Changes Ancillary Material Cost One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ MMBtu $ MMBtu $ MMBtu $ $ $ $ $ $
01: 2.1331 BURN A LESS EXPENSIVE GRADE OF FUEL Savings:
$625,275
Cost:
$321,478
- - - - $(-940,633) (-131,557) $1,565,908 131,557 - - - - - - - - -
-
kWh
-
-
kW-months/year
$(-940,633)
(-131,557)
MMBtu
$1,565,908
131,557
MMBtu
-
-
MMBtu
-
-
$
-
-
$
-
-
$
02: 2.5194 REDESIGN PROCESS Savings:
$778,933
Cost:
$500,000
$96,932 492,660 $1,483 339 - - $430,518 36,178 - - - - - - $250,000 - $96,932
492,660
kWh
$1,483
339
kW-months/year
-
-
MMBtu
$430,518
36,178
MMBtu
-
-
MMBtu
-
-
$
-
-
$
$250,000
-
$
03: 4.651 INSTALL BACK-UP EQUIPMENT Savings:
$297,917
Cost:
$1,360,000
- - - - - - - - $(-81,299) (-3,524) $(-4,784) - - - $384,000 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
$(-81,299)
(-3,524)
MMBtu
$(-4,784)
-
$
-
-
$
$384,000
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$13,723
Cost:
$5,870
$11,400 57,935 $168 38 - - - - - - - - $2,155 - - - $11,400
57,935
kWh
$168
38
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
MMBtu
-
-
$
$2,155
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$1,715,848
Cost:
$2,187,348
$108,332 550,595 $1,651 377 $(-940,633) (-131,557) $1,996,426 167,735 $(-81,299) (-3,524) $(-4,784) - $2,155 - $634,000 - $108,332
550,595
kWh
$1,651
377
kW-months/year
$(-940,633)
(-131,557)
MMBtu
$1,996,426
167,735
MMBtu
$(-81,299)
(-3,524)
MMBtu
$(-4,784)
-
$
$2,155
-
$
$634,000
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
MMBtu
-
-
$
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ MMBtu $ MMBtu $ $ $ $ $ $
Electricity Usage Electricity Demand Natural Gas LPG Fuel Oil #1 Personnel Changes Ancillary Material Cost One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas LPG Fuel Oil #1 Personnel Changes Ancillary Material Cost One-time Revenue or Avoided Cost