IAC logo
IAC Assessment: AT0022
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AT0022
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina A&T
Assessment Year 1985
Principal Product CORRUCATED SHEETS
NAICS n/a
SIC 2679 - Converted Paper Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 80
Plant Area (Sq.Ft.) 0
Annual Production 684 Thousand Feet
Production Hrs. Annual 6,240
Location (State) NC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $66,897 1,441,970 kWh $0.05
Natural Gas $174,920 35,567 MMBtu $4.92
TOTAL ENERGY COSTS $241,817
RECOMMENDED SAVINGS* $23,475 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $23,475
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$449
Cost:
$422
$449 9,672 - - $449
9,672
kWh
-
-
MMBtu
02: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$17,673
Cost:
$300
- - $17,673 3,592 -
-
kWh
$17,673
3,592
MMBtu
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$394
Cost:
-
$394 8,499 - - $394
8,499
kWh
-
-
MMBtu
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$272
Cost:
$250
$272 5,862 - - $272
5,862
kWh
-
-
MMBtu
05: 2.7226 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE Savings:
$830
Cost:
$450
$830 17,878 - - $830
17,878
kWh
-
-
MMBtu
06: 2.2122 INSTALL / REPAIR INSULATION ON CONDENSATE LINES Savings:
$2,293
Cost:
$1,920
- - $2,293 466 -
-
kWh
$2,293
466
MMBtu
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,564
Cost:
$205
$1,564 33,705 - - $1,564
33,705
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$23,475
Cost:
$3,547
$3,509 75,616 $19,966 4,058 $3,509
75,616
kWh
$19,966
4,058
MMBtu
TOTAL IMPLEMENTED Savings:
$23,475
Cost:
$3,547
$3,509 75,616 $19,966 4,058 $3,509
75,616
kWh
$19,966
4,058
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas