IAC logo
IAC Assessment: AT0034
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AT0034
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina A&T
Assessment Year 1986
Principal Product WHIPPED CREAM, ETC.
NAICS n/a
SIC 2024 - Ice Cream And Frozen Desserts
Sales $10,000,000-$50,000,000
# of Employees 70
Plant Area (Sq.Ft.) 0
Annual Production 52,000,000 Pounds
Production Hrs. Annual 4,576
Location (State) NC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $91,204 1,842,907 kWh $0.05
Natural Gas $81,450 13,523 MMBtu $6.02
TOTAL ENERGY COSTS $172,654
RECOMMENDED SAVINGS* $14,142 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $14,142
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$264
Cost:
$195
$264 5,275 - - $264
5,275
kWh
-
-
MMBtu
02: 2.1131 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC Savings:
$4,201
Cost:
$2,000
- - $4,201 723 -
-
kWh
$4,201
723
MMBtu
03: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$2,806
Cost:
$900
- - $2,806 483 -
-
kWh
$2,806
483
MMBtu
04: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$1,213
Cost:
$1,000
- - $1,213 209 -
-
kWh
$1,213
209
MMBtu
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$303
Cost:
$50
$303 6,155 - - $303
6,155
kWh
-
-
MMBtu
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$268
Cost:
$250
$268 5,275 - - $268
5,275
kWh
-
-
MMBtu
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$90
Cost:
$163
$90 1,758 - - $90
1,758
kWh
-
-
MMBtu
08: 2.2121 INCREASE AMOUNT OF CONDENSATE RETURNED Savings:
$4,997
Cost:
$5,000
- - $4,997 860 -
-
kWh
$4,997
860
MMBtu
TOTAL RECOMMENDED Savings:
$14,142
Cost:
$9,558
$925 18,463 $13,217 2,275 $925
18,463
kWh
$13,217
2,275
MMBtu
TOTAL IMPLEMENTED Savings:
$14,142
Cost:
$9,558
$925 18,463 $13,217 2,275 $925
18,463
kWh
$13,217
2,275
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas