IAC Assessment: AT0084
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AT0084
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina A&T
Assessment Year 1987
Principal Product COTTON FABRIC
NAICS n/a
SIC 2211 - Broadwoven Fabric Mills, Cotton
Sales $10,000,000-$50,000,000
# of Employees 245
Plant Area (Sq.Ft.) 0
Annual Production 12,000,000 Pounds
Production Hrs. Annual 8,736
Location (State) NC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $352,164 7,628,077 kWh $0.05
Natural Gas $555,723 205,295 MMBtu $2.71
Fuel Oil #2 $32,171 7,798 MMBtu $4.13
TOTAL ENERGY COSTS $940,058
RECOMMENDED SAVINGS* $101,098 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $44,641
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.2443 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR Savings:
$31,324
Cost:
$10,000
- - $31,324 11,601 -
-
kWh
$31,324
11,601
MMBtu
02: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$10,654
Cost:
$12,000
- - $10,654 3,946 -
-
kWh
$10,654
3,946
MMBtu
03: 2.2531 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR Savings:
$22,702
Cost:
$5,000
- - $22,702 8,408 -
-
kWh
$22,702
8,408
MMBtu
04: 2.2121 INCREASE AMOUNT OF CONDENSATE RETURNED Savings:
$9,822
Cost:
$1,000
- - $9,822 3,638 -
-
kWh
$9,822
3,638
MMBtu
05: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$6,988
Cost:
$6,000
- - $6,988 2,588 -
-
kWh
$6,988
2,588
MMBtu
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,220
Cost:
$865
$5,220 112,837 - - $5,220
112,837
kWh
-
-
MMBtu
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,813
Cost:
$22,500
$5,813 126,026 - - $5,813
126,026
kWh
-
-
MMBtu
08: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$2,139
Cost:
$1,152
$2,139 46,307 - - $2,139
46,307
kWh
-
-
MMBtu
09: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$697
Cost:
$800
$697 15,240 - - $697
15,240
kWh
-
-
MMBtu
10: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$1,297
Cost:
$3,000
$1,297 145,662 - - $1,297
145,662
kWh
-
-
MMBtu
11: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$2,708
Cost:
-
$2,708 58,617 - - $2,708
58,617
kWh
-
-
MMBtu
12: 2.7226 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE Savings:
$1,734
Cost:
$1,500
$1,734 37,515 - - $1,734
37,515
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$101,098
Cost:
$63,817
$19,608 542,204 $81,490 30,181 $19,608
542,204
kWh
$81,490
30,181
MMBtu
TOTAL IMPLEMENTED Savings:
$44,641
Cost:
$46,517
$17,177 489,449 $27,464 10,172 $17,177
489,449
kWh
$27,464
10,172
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas