IAC logo
IAC Assessment: BD0014
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: BD0014
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Bradley University
Assessment Year 1994
Principal Product Paperboard
NAICS n/a
SIC 2631 - Paperboard Mills
Sales $5,000,000-$10,000,000
# of Employees 45
Plant Area (Sq.Ft.) 100,000
Annual Production 24,500 Tons
Production Hrs. Annual 8,736
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $51,603 762,896 kWh $0.07
Natural Gas $829,708 289,333 MMBtu $2.87
TOTAL ENERGY COSTS $881,311
RECOMMENDED SAVINGS* $240,630 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $28,465
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.1223 INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) Savings:
$206,117
Cost:
$508,700
- - $206,117 94,650 -
-
kWh
$206,117
94,650
MMBtu
02: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$3,879
Cost:
$7,000
$4,732 69,754 $(-853) (-297) $4,732
69,754
kWh
$(-853)
(-297)
MMBtu
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$22,398
Cost:
$33,500
$22,398 330,012 - - $22,398
330,012
kWh
-
-
MMBtu
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,051
Cost:
$20
$1,051 15,533 - - $1,051
15,533
kWh
-
-
MMBtu
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,150
Cost:
$500
$1,150 16,999 - - $1,150
16,999
kWh
-
-
MMBtu
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,866
Cost:
$2,342
$3,866 56,858 - - $3,866
56,858
kWh
-
-
MMBtu
07: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$2,169
Cost:
$1,000
$2,169 31,946 - - $2,169
31,946
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$240,630
Cost:
$553,062
$35,366 521,102 $205,264 94,353 $35,366
521,102
kWh
$205,264
94,353
MMBtu
TOTAL IMPLEMENTED Savings:
$28,465
Cost:
$36,362
$28,465 419,402 - - $28,465
419,402
kWh
-
-
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas