IAC logo
IAC Assessment: BD0023
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: BD0023
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Bradley University
Assessment Year 1995
Principal Product Custom Machinery
NAICS n/a
SIC 3599 - Industrial Machinery, Nec
Sales $5,000,000-$10,000,000
# of Employees 80
Plant Area (Sq.Ft.) 85,000
Annual Production 25 Tons
Production Hrs. Annual 5,460
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $132,773 2,147,128 kWh $0.06
Natural Gas $15,139 3,221 MMBtu $4.70
TOTAL ENERGY COSTS $147,912
RECOMMENDED SAVINGS* $8,777 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $2,822
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,980
Cost:
$500
$1,980 31,946 - - $1,980
31,946
kWh
-
-
MMBtu
02: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$807
Cost:
$600
$807 13,189 - - $807
13,189
kWh
-
-
MMBtu
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,215
Cost:
$150
$1,215 19,637 - - $1,215
19,637
kWh
-
-
MMBtu
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$801
Cost:
$20
$801 12,896 - - $801
12,896
kWh
-
-
MMBtu
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$534
Cost:
$6,380
$534 8,792 - - $534
8,792
kWh
-
-
MMBtu
06: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$3,132
Cost:
$64
$3,132 50,703 - - $3,132
50,703
kWh
-
-
MMBtu
07: 2.6214 SHUT OFF PILOTS IN STANDBY EQUIPMENT Savings:
$308
Cost:
-
- - $308 66 -
-
kWh
$308
66
MMBtu
TOTAL RECOMMENDED Savings:
$8,777
Cost:
$7,714
$8,469 137,163 $308 66 $8,469
137,163
kWh
$308
66
MMBtu
TOTAL IMPLEMENTED Savings:
$2,822
Cost:
$6,880
$2,514 40,738 $308 66 $2,514
40,738
kWh
$308
66
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas