IAC logo
IAC Assessment: BD0037
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: BD0037
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Bradley University
Assessment Year 1995
Principal Product Stainless Steel Wire
NAICS n/a
SIC 3315 - Steel Wire And Related Products
Sales $1,000,000-$5,000,000
# of Employees 9
Plant Area (Sq.Ft.) 22,400
Annual Production 2,000,000 Pounds
Production Hrs. Annual 6,240
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $47,216 627,784 kWh $0.08
Natural Gas $10,342 2,702 MMBtu $3.83
TOTAL ENERGY COSTS $57,558
RECOMMENDED SAVINGS* $28,395 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $6,923
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.2511 INSULATE BARE EQUIPMENT Savings:
$602
Cost:
$174
- - $602 157 -
-
kWh
$602
157
MMBtu
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$706
Cost:
$359
$706 9,379 - - $706
9,379
kWh
-
-
MMBtu
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$2,988
Cost:
$3,590
$2,988 39,859 - - $2,988
39,859
kWh
-
-
MMBtu
04: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$2,911
Cost:
$5,060
$2,911 38,687 - - $2,911
38,687
kWh
-
-
MMBtu
05: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$20,870
Cost:
$17,500
$28,005 436,694 $(-7,135) (-1,863) $28,005
436,694
kWh
$(-7,135)
(-1,863)
MMBtu
06: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$318
Cost:
$150
$318 4,103 - - $318
4,103
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$28,395
Cost:
$26,833
$34,928 528,722 $(-6,533) (-1,706) $34,928
528,722
kWh
$(-6,533)
(-1,706)
MMBtu
TOTAL IMPLEMENTED Savings:
$6,923
Cost:
$9,159
$6,923 92,028 - - $6,923
92,028
kWh
-
-
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas