IAC logo
IAC Assessment: BD0073
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: BD0073
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Bradley University
Assessment Year 1996
Principal Product Truck Bodies
NAICS n/a
SIC 3713 - Truck And Bus Bodies
Sales $5,000,000-$10,000,000
# of Employees 43
Plant Area (Sq.Ft.) 48,500
Annual Production 1,300 Pieces
Production Hrs. Annual 2,340
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $15,532 344,080 kWh $0.05
Electricity Demand $20,218 1,662 kW-months/year $12.16
Electricity Fees $374 - $ -
Natural Gas $13,614 3,722 MMBtu $3.66
TOTAL ENERGY COSTS $54,778
RECOMMENDED SAVINGS* $20,251 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.7491 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS Savings:
$2,206
Cost:
$3,779
- - - - $2,206 657 - - -
-
kWh
-
-
kW-months/year
$2,206
657
MMBtu
-
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,491
Cost:
$850
$1,491 33,118 - - - - - - $1,491
33,118
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$643
Cost:
$600
$302 6,741 $341 28 - - - - $302
6,741
kWh
$341
28
kW-months/year
-
-
MMBtu
-
-
$
04: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$527
Cost:
$1,410
- - $527 42 - - - - -
-
kWh
$527
42
kW-months/year
-
-
MMBtu
-
-
$
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$498
Cost:
$500
$218 4,982 $280 23 - - - - $218
4,982
kWh
$280
23
kW-months/year
-
-
MMBtu
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$216
Cost:
$337
$92 2,052 $124 10 - - - - $92
2,052
kWh
$124
10
kW-months/year
-
-
MMBtu
-
-
$
07: 3.2123 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS Savings:
$14,670
Cost:
$2,700
- - - - - - $14,670 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$14,670
-
$
TOTAL RECOMMENDED Savings:
$20,251
Cost:
$10,176
$2,103 46,893 $1,272 103 $2,206 657 $14,670 - $2,103
46,893
kWh
$1,272
103
kW-months/year
$2,206
657
MMBtu
$14,670
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost