Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Bradley University |
---|---|
Assessment Year | 1997 |
Principal Product | Steel Metal Fixtures |
NAICS | n/a |
SIC | 3449 - Miscellaneous Metal Work |
Sales | $5,000,000-$10,000,000 |
# of Employees | 50 |
Plant Area (Sq.Ft.) | 38,000 |
Annual Production | 3,000,000 Pounds |
Production Hrs. Annual | 5,200 |
Location (State) | IL |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $60,154 | 1,071,219 | kWh | $0.06 |
Electricity Demand | $4,602 | 2,630 | kW-months/year | $1.75 |
Electricity Fees | $8,991 | - | $ | - |
Natural Gas | $50,092 | 10,652 | MMBtu | $4.70 |
TOTAL ENERGY COSTS | $132,839 | |||
RECOMMENDED SAVINGS* | $82,617 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Ancillary Material Cost | Water Consumption | Electricity Usage | Electricity Demand | Natural Gas | Ancillary Material Cost | Water Consumption | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | Tgal | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $11,003 Cost: $2,000 |
- | - | - | - | $11,003 | 2,331 | - | - | - | - |
- - kWh |
- - kW-months/year |
$11,003 2,331 MMBtu |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7491 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS |
Savings: $1,713 Cost: $2,690 |
- | - | - | - | $1,713 | 363 | - | - | - | - |
- - kWh |
- - kW-months/year |
$1,713 363 MMBtu |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $1,623 Cost: $5,410 |
$1,519 | 27,257 | $104 | 59 | - | - | - | - | - | - |
$1,519 27,257 kWh |
$104 59 kW-months/year |
- - MMBtu |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $1,498 Cost: $500 |
$1,404 | 25,205 | $94 | 54 | - | - | - | - | - | - |
$1,404 25,205 kWh |
$94 54 kW-months/year |
- - MMBtu |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $1,363 Cost: - |
$1,278 | 22,860 | $85 | 49 | - | - | - | - | - | - |
$1,278 22,860 kWh |
$85 49 kW-months/year |
- - MMBtu |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $705 Cost: $1,007 |
$705 | 20,809 | - | - | - | - | - | - | - | - |
$705 20,809 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $445 Cost: $450 |
$436 | 7,913 | $9 | 5 | - | - | - | - | - | - |
$436 7,913 kWh |
$9 5 kW-months/year |
- - MMBtu |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 3.5311 RECOVER AND REUSE WASTE MATERIAL |
Savings: $63,963 Cost: $30,000 |
- | - | - | - | - | - | $63,963 | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$63,963 - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 3.4151 MINIMIZE WATER USAGE |
Savings: $304 Cost: $775 |
- | - | - | - | - | - | - | - | $304 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
$304 - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $82,617 Cost: $42,832 |
$5,342 | 104,044 | $292 | 167 | $12,716 | 2,694 | $63,963 | - | $304 | - | $5,342 104,044 kWh |
$292 167 kW-months/year |
$12,716 2,694 MMBtu |
$63,963 - $ |
$304 - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - | - | - | - | - - kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | Tgal | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Ancillary Material Cost | Water Consumption | Electricity Usage | Electricity Demand | Natural Gas | Ancillary Material Cost | Water Consumption |