IAC logo
IAC Assessment: BD0087
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: BD0087
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Bradley University
Assessment Year 1997
Principal Product Steel Balls
NAICS n/a
SIC 3315 - Steel Wire And Related Products
Sales $10,000,000-$50,000,000
# of Employees 99
Plant Area (Sq.Ft.) 83,500
Annual Production 6,240 Tons
Production Hrs. Annual 7,488
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $255,596 6,671,161 kWh $0.04
Electricity Demand $65,308 15,661 kW-months/year $4.17
Electricity Fees $9,998 - $ -
Natural Gas $117,554 33,967 MMBtu $3.46
TOTAL ENERGY COSTS $612,656
RECOMMENDED SAVINGS* $64,931 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $52,734
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Primary Product Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Primary Product
$ kWh $ kW-months/year $ MMBtu $ $ $ $ $ $
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$20,443
Cost:
$40,890
$18,069 471,864 $2,374 570 - - - - - - - - $18,069
471,864
kWh
$2,374
570
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
02: 2.1114 LIMIT AND CONTROL SECONDARY COMBUSTION AIR IN FURNACE Savings:
$7,026
Cost:
$8,500
- - - - $7,026 2,030 - - - - - - -
-
kWh
-
-
kW-months/year
$7,026
2,030
MMBtu
-
-
$
-
-
$
-
-
$
03: 2.7491 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS Savings:
$5,680
Cost:
$5,100
$2,445 65,358 - - $3,235 899 - - - - - - $2,445
65,358
kWh
-
-
kW-months/year
$3,235
899
MMBtu
-
-
$
-
-
$
-
-
$
04: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$5,171
Cost:
$3,750
$7,313 47,773 $676 651 $(-2,818) (-814) - - - - - - $7,313
47,773
kWh
$676
651
kW-months/year
$(-2,818)
(-814)
MMBtu
-
-
$
-
-
$
-
-
$
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,365
Cost:
$1,125
$1,293 33,705 $72 17 - - - - - - - - $1,293
33,705
kWh
$72
17
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
06: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$10,295
Cost:
$7,000
$(-8) (-293) - - - - $(-1,290) - $11,593 - - - $(-8)
(-293)
kWh
-
-
kW-months/year
-
-
MMBtu
$(-1,290)
-
$
$11,593
-
$
-
-
$
07: 4.611 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE Savings:
$14,951
Cost:
$3,000
- - - - - - - - - - $14,951 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
$14,951
-
$
TOTAL RECOMMENDED Savings:
$64,931
Cost:
$69,365
$29,112 618,407 $3,122 1,238 $7,443 2,115 $(-1,290) - $11,593 - $14,951 - $29,112
618,407
kWh
$3,122
1,238
kW-months/year
$7,443
2,115
MMBtu
$(-1,290)
-
$
$11,593
-
$
$14,951
-
$
TOTAL IMPLEMENTED Savings:
$52,734
Cost:
$57,115
$21,799 570,634 $2,446 587 $3,235 899 $(-1,290) - $11,593 - $14,951 - $21,799
570,634
kWh
$2,446
587
kW-months/year
$3,235
899
MMBtu
$(-1,290)
-
$
$11,593
-
$
$14,951
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Primary Product Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Primary Product