IAC Assessment: BD0091
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: BD0091
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Bradley University
Assessment Year 1997
Principal Product Injection Moldings
NAICS n/a
SIC 3089 - Plastics Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 140
Plant Area (Sq.Ft.) 41,000
Annual Production 450,000 Pounds
Production Hrs. Annual 6,240
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $129,641 2,779,895 kWh $0.05
Electricity Demand $81,024 6,250 kW-months/year $12.96
Electricity Fees $1,803 - $ -
Natural Gas $6,043 1,376 MMBtu $4.39
TOTAL ENERGY COSTS $236,511
RECOMMENDED SAVINGS* $102,927 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $62,095
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Administrative Changes Primary Raw Material Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Administrative Changes Primary Raw Material Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $ $ $ $ $
01: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$38,324
Cost:
$24,791
$31,281 671,161 $18,589 1,434 $(-11,546) (-2,946) - - - - - - - - - - $31,281
671,161
kWh
$18,589
1,434
kW-months/year
$(-11,546)
(-2,946)
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
$
02: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$37,336
Cost:
$500
- - - - - - - - - - $37,336 - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
$37,336
-
$
-
-
$
-
-
$
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$7,396
Cost:
$8,110
$4,618 99,062 $2,778 214 - - - - - - - - - - - - $4,618
99,062
kWh
$2,778
214
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
$
04: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$3,496
Cost:
$1,920
$3,553 76,202 $1,218 94 $(-1,275) (-325) - - - - - - - - - - $3,553
76,202
kWh
$1,218
94
kW-months/year
$(-1,275)
(-325)
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,875
Cost:
$2,077
$1,218 26,084 $657 51 - - - - - - - - - - - - $1,218
26,084
kWh
$657
51
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
$
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,261
Cost:
$400
$966 20,809 $295 23 - - - - - - - - - - - - $966
20,809
kWh
$295
23
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
$
07: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$783
Cost:
$600
$499 10,844 $284 22 - - - - - - - - - - - - $499
10,844
kWh
$284
22
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
$
08: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$9,643
Cost:
$7,500
- - - - - - $3,473 136,656 $(-660) - - - - - $6,830 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$3,473
136,656
lb
$(-660)
-
$
-
-
$
-
-
$
$6,830
-
$
09: 3.5311 RECOVER AND REUSE WASTE MATERIAL Savings:
$2,813
Cost:
$2,250
$(-750) (-16,120) - - - - $132 21,675 $(-3,900) - - - $7,331 - - - $(-750)
(-16,120)
kWh
-
-
kW-months/year
-
-
MMBtu
$132
21,675
lb
$(-3,900)
-
$
-
-
$
$7,331
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$102,927
Cost:
$48,148
$41,385 888,042 $23,821 1,838 $(-12,821) (-3,271) $3,605 158,331 $(-4,560) - $37,336 - $7,331 - $6,830 - $41,385
888,042
kWh
$23,821
1,838
kW-months/year
$(-12,821)
(-3,271)
MMBtu
$3,605
158,331
lb
$(-4,560)
-
$
$37,336
-
$
$7,331
-
$
$6,830
-
$
TOTAL IMPLEMENTED Savings:
$62,095
Cost:
$45,728
$37,832 811,840 $22,603 1,744 $(-11,546) (-2,946) $3,605 158,331 $(-4,560) - - - $7,331 - $6,830 - $37,832
811,840
kWh
$22,603
1,744
kW-months/year
$(-11,546)
(-2,946)
MMBtu
$3,605
158,331
lb
$(-4,560)
-
$
-
-
$
$7,331
-
$
$6,830
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $ $ $ $ $
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Administrative Changes Primary Raw Material Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Administrative Changes Primary Raw Material Ancillary Material Cost