IAC Assessment: BD0111
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: BD0111
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Bradley University
Assessment Year 1998
Principal Product Printed Matter
NAICS n/a
SIC 2741 - Miscellaneous Publishing
Sales $1,000,000-$5,000,000
# of Employees 40
Plant Area (Sq.Ft.) 48,500
Annual Production 96,000,000 Pieces
Production Hrs. Annual 2,210
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $39,491 920,868 kWh $0.04
Electricity Demand $26,867 2,068 kW-months/year $12.99
Electricity Fees $686 - $ -
Natural Gas $3,992 780 MMBtu $5.12
TOTAL ENERGY COSTS $80,571
RECOMMENDED SAVINGS* $52,249 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Administrative Changes Electricity Usage Electricity Demand Administrative Changes
$ kWh $ kW-months/year $ $
01: 2.7132 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS Savings:
$14,714
Cost:
$2,000
$13,764 355,803 - - $950 - $13,764
355,803
kWh
-
-
kW-months/year
$950
-
$
02: 2.7141 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS Savings:
$5,826
Cost:
$6,050
$4,067 105,217 $1,869 144 $(-110) - $4,067
105,217
kWh
$1,869
144
kW-months/year
$(-110)
-
$
03: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$1,891
Cost:
$325
$1,237 31,946 $569 44 $85 - $1,237
31,946
kWh
$569
44
kW-months/year
$85
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$327
Cost:
$310
$129 3,224 $60 5 $138 - $129
3,224
kWh
$60
5
kW-months/year
$138
-
$
05: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$260
Cost:
$960
$110 2,931 $150 12 - - $110
2,931
kWh
$150
12
kW-months/year
-
-
$
06: 3.5311 RECOVER AND REUSE WASTE MATERIAL Savings:
$25,326
Cost:
$7,200
- - - - $25,326 - -
-
kWh
-
-
kW-months/year
$25,326
-
$
07: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$2,681
Cost:
$200
- - - - $2,681 - -
-
kWh
-
-
kW-months/year
$2,681
-
$
08: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY Savings:
$634
Cost:
$300
- - - - $634 - -
-
kWh
-
-
kW-months/year
$634
-
$
09: 4.821 PAY BILLS ON TIME TO AVOID LATE FEES Savings:
$590
Cost:
-
- - - - $590 - -
-
kWh
-
-
kW-months/year
$590
-
$
TOTAL RECOMMENDED Savings:
$52,249
Cost:
$17,345
$19,307 499,121 $2,648 205 $30,294 - $19,307
499,121
kWh
$2,648
205
kW-months/year
$30,294
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Administrative Changes Electricity Usage Electricity Demand Administrative Changes