Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Bradley University
Assessment Year 1998
Principal Product Concrete Panels
NAICS n/a
SIC 3272 - Concrete Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 110
Plant Area (Sq.Ft.) 59,000
Annual Production 11,000 Pieces
Production Hrs. Annual 3,510
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $30,609 681,125 kWh $0.04
Electricity Demand $36,939 3,028 kW-months/year $12.20
Electricity Fees $425 - $ -
Natural Gas $90,318 23,053 MMBtu $3.92
TOTAL ENERGY COSTS $166,813
RECOMMENDED SAVINGS* $80,766 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $6,848
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Administrative Changes Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ lb $ $
01: 2.3192 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS Savings:
$20,275
Cost:
$1,000
$9,805 233,880 $25,620 2,100 - - - - $(-15,150) - $9,805
233,880
kWh
$25,620
2,100
kW-months/year
-
-
MMBtu
-
-
lb
$(-15,150)
-
$
02: 2.1213 DIRECT WARMEST AIR TO COMBUSTION INTAKE Savings:
$5,254
Cost:
$12,000
- - - - $5,254 1,340 - - - - -
-
kWh
-
-
kW-months/year
$5,254
1,340
MMBtu
-
-
lb
-
-
$
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,019
Cost:
$825
$499 12,016 $520 43 - - - - - - $499
12,016
kWh
$520
43
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
04: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$900
Cost:
$650
$569 13,482 $296 24 - - - - $35 - $569
13,482
kWh
$296
24
kW-months/year
-
-
MMBtu
-
-
lb
$35
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$266
Cost:
$230
$112 2,638 $44 4 - - - - $110 - $112
2,638
kWh
$44
4
kW-months/year
-
-
MMBtu
-
-
lb
$110
-
$
06: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY Savings:
$5,558
Cost:
$350
- - - - - - $5,558 315,900 - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$5,558
315,900
lb
-
-
$
07: 3.5212 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS Savings:
$694
Cost:
-
- - - - - - - - $694 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
$694
-
$
08: 4.423 MOVE PRODUCT USING MECHANICAL MEANS Savings:
$46,800
Cost:
$90,000
- - - - - - - - $46,800 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
$46,800
-
$
TOTAL RECOMMENDED Savings:
$80,766
Cost:
$105,055
$10,985 262,016 $26,480 2,171 $5,254 1,340 $5,558 315,900 $32,489 - $10,985
262,016
kWh
$26,480
2,171
kW-months/year
$5,254
1,340
MMBtu
$5,558
315,900
lb
$32,489
-
$
TOTAL IMPLEMENTED Savings:
$6,848
Cost:
$12,650
$569 13,482 $296 24 $5,254 1,340 - - $729 - $569
13,482
kWh
$296
24
kW-months/year
$5,254
1,340
MMBtu
-
-
lb
$729
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Administrative Changes Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Administrative Changes