IAC Assessment: BD0113
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: BD0113
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Bradley University
Assessment Year 1998
Principal Product Coated Steel Wire
NAICS n/a
SIC 3315 - Steel Wire And Related Products
Sales $5,000,000-$10,000,000
# of Employees 20
Plant Area (Sq.Ft.) 70,000
Annual Production 10,000 Tons
Production Hrs. Annual 6,240
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $47,159 896,542 kWh $0.05
Electricity Demand $5,322 2,256 kW-months/year $2.36
Electricity Fees $1,144 - $ -
Natural Gas $132,677 35,199 MMBtu $3.77
TOTAL ENERGY COSTS $197,318
RECOMMENDED SAVINGS* $16,868 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Administrative Changes Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ lb $ $
01: 2.2514 COVER OPEN TANKS Savings:
$3,808
Cost:
$1,100
- - - - $3,808 1,379 - - - - -
-
kWh
-
-
kW-months/year
$3,808
1,379
MMBtu
-
-
lb
-
-
$
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$2,213
Cost:
$4,250
$1,683 44,549 $530 65 - - - - - - $1,683
44,549
kWh
$530
65
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
03: 2.1213 DIRECT WARMEST AIR TO COMBUSTION INTAKE Savings:
$2,124
Cost:
$1,500
- - - - $2,124 769 - - - - -
-
kWh
-
-
kW-months/year
$2,124
769
MMBtu
-
-
lb
-
-
$
04: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$1,538
Cost:
$3,000
$1,738 48,652 $398 53 $(-598) (-207) - - - - $1,738
48,652
kWh
$398
53
kW-months/year
$(-598)
(-207)
MMBtu
-
-
lb
-
-
$
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$768
Cost:
-
$542 14,361 $226 28 - - - - - - $542
14,361
kWh
$226
28
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
06: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$548
Cost:
$400
$382 10,258 $166 20 - - - - - - $382
10,258
kWh
$166
20
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
07: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS Savings:
$4,349
Cost:
$1,250
- - - - - - $4,349 10,800 - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$4,349
10,800
lb
-
-
$
08: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$480
Cost:
$250
- - - - - - - - $480 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
$480
-
$
09: 4.821 PAY BILLS ON TIME TO AVOID LATE FEES Savings:
$1,040
Cost:
-
- - - - - - - - $1,040 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
$1,040
-
$
TOTAL RECOMMENDED Savings:
$16,868
Cost:
$11,750
$4,345 117,820 $1,320 166 $5,334 1,941 $4,349 10,800 $1,520 - $4,345
117,820
kWh
$1,320
166
kW-months/year
$5,334
1,941
MMBtu
$4,349
10,800
lb
$1,520
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Administrative Changes Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Administrative Changes