IAC logo
IAC Assessment: BD0122
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: BD0122
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Bradley University
Assessment Year 1998
Principal Product Outdoor Storage Lockers and Buildings
NAICS n/a
SIC 3448 - Prefabricated Metal Buildings
Sales $5,000,000-$10,000,000
# of Employees 60
Plant Area (Sq.Ft.) 89,000
Annual Production 1,000 Pieces
Production Hrs. Annual 2,730
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $18,284 526,964 kWh $0.03
Electricity Demand $29,095 2,352 kW-months/year $12.37
Electricity Fees $673 - $ -
Natural Gas $16,519 3,179 MMBtu $5.20
TOTAL ENERGY COSTS $65,406
RECOMMENDED SAVINGS* $89,330 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $2,598
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Solid Waste (non-haz) Personnel Changes One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Solid Waste (non-haz) Personnel Changes One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ MMBtu $ gal $ lb $ $ $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,044
Cost:
$12,900
$1,746 50,410 $2,298 186 - - - - - - - - - - $1,746
50,410
kWh
$2,298
186
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
-
-
$
02: 2.7231 USE RADIANT HEATER FOR SPOT HEATING Savings:
$3,315
Cost:
$7,200
- - - - $3,315 661 - - - - - - - - -
-
kWh
-
-
kW-months/year
$3,315
661
MMBtu
-
-
gal
-
-
lb
-
-
$
-
-
$
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$2,196
Cost:
$1,350
$825 23,740 $1,371 111 - - - - - - - - - - $825
23,740
kWh
$1,371
111
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
-
-
$
04: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$1,934
Cost:
$750
- - - - $1,934 386 - - - - - - - - -
-
kWh
-
-
kW-months/year
$1,934
386
MMBtu
-
-
gal
-
-
lb
-
-
$
-
-
$
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$351
Cost:
$250
$137 3,810 $214 17 - - - - - - - - - - $137
3,810
kWh
$214
17
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
-
-
$
06: 2.2123 INSULATE FEEDWATER TANK Savings:
$56,279
Cost:
$15,800
- - - - - - $56,279 16,609 - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$56,279
16,609
gal
-
-
lb
-
-
$
-
-
$
07: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$8,070
Cost:
$8,000
- - - - - - - - $8,070 226,000 - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
$8,070
226,000
lb
-
-
$
-
-
$
08: 4.4460 AUTOMATE FINISHING PROCESS Savings:
$12,828
Cost:
$25,000
- - - - - - - - - - $12,828 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
$12,828
-
$
-
-
$
09: 4.8210 PAY BILLS ON TIME TO AVOID LATE FEES Savings:
$313
Cost:
-
- - - - - - - - - - - - $313 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
$313
-
$
TOTAL RECOMMENDED Savings:
$89,330
Cost:
$71,250
$2,708 77,960 $3,883 314 $5,249 1,047 $56,279 16,609 $8,070 226,000 $12,828 - $313 - $2,708
77,960
kWh
$3,883
314
kW-months/year
$5,249
1,047
MMBtu
$56,279
16,609
gal
$8,070
226,000
lb
$12,828
-
$
$313
-
$
TOTAL IMPLEMENTED Savings:
$2,598
Cost:
$1,000
$137 3,810 $214 17 $1,934 386 - - - - - - $313 - $137
3,810
kWh
$214
17
kW-months/year
$1,934
386
MMBtu
-
-
gal
-
-
lb
-
-
$
$313
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ gal $ lb $ $ $ $
Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Solid Waste (non-haz) Personnel Changes One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Solid Waste (non-haz) Personnel Changes One-time Revenue or Avoided Cost