IAC logo
IAC Assessment: BD0130
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: BD0130
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Bradley University
Assessment Year 1999
Principal Product Printed Paper
NAICS n/a
SIC 2752 - Commercial Printing, Lithographic
Sales $5,000,000-$10,000,000
# of Employees 70
Plant Area (Sq.Ft.) 40,000
Annual Production 5,100,000 Pounds
Production Hrs. Annual 6,864
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $60,273 1,324,150 kWh $0.05
Electricity Demand $47,459 3,774 kW-months/year $12.58
Electricity Fees $1,279 - $ -
Natural Gas $7,482 1,558 MMBtu $4.80
TOTAL ENERGY COSTS $120,134
RECOMMENDED SAVINGS* $36,306 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $6,375
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $
01: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$4,723
Cost:
$500
- - - - $4,723 1,165 - - - - -
-
kWh
-
-
kW-months/year
$4,723
1,165
MMBtu
-
-
Tgal
-
-
$
02: 2.7231 USE RADIANT HEATER FOR SPOT HEATING Savings:
$3,506
Cost:
$2,000
$1,270 30,188 $423 41 $1,813 447 - - - - $1,270
30,188
kWh
$423
41
kW-months/year
$1,813
447
MMBtu
-
-
Tgal
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$807
Cost:
$646
$495 11,723 $312 25 - - - - - - $495
11,723
kWh
$312
25
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
04: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,466
Cost:
$2,040
$1,068 25,498 $398 32 - - - - - - $1,068
25,498
kWh
$398
32
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,416
Cost:
$1,614
$929 22,274 $487 39 - - - - - - $929
22,274
kWh
$487
39
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
06: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$867
Cost:
$450
$571 13,775 $296 24 - - - - - - $571
13,775
kWh
$296
24
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
07: 3.4115 RECOVER AND REUSE COOLING WATER Savings:
$1,453
Cost:
$2,410
- - - - - - $1,453 308,880 - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$1,453
308,880
Tgal
-
-
$
08: 4.444 INSTALL SYSTEM TO COLLECT SCRAP Savings:
$22,068
Cost:
$8,700
- - - - - - - - $22,068 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
$22,068
-
$
TOTAL RECOMMENDED Savings:
$36,306
Cost:
$18,360
$4,333 103,458 $1,916 161 $6,536 1,612 $1,453 308,880 $22,068 - $4,333
103,458
kWh
$1,916
161
kW-months/year
$6,536
1,612
MMBtu
$1,453
308,880
Tgal
$22,068
-
$
TOTAL IMPLEMENTED Savings:
$6,375
Cost:
$6,024
$2,199 52,462 $910 80 $1,813 447 $1,453 308,880 - - $2,199
52,462
kWh
$910
80
kW-months/year
$1,813
447
MMBtu
$1,453
308,880
Tgal
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $
Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes