IAC logo
IAC Assessment: BD0132
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: BD0132
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Bradley University
Assessment Year 1999
Principal Product Turbine Engine Components
NAICS n/a
SIC 3724 - Aircraft Engines And Engine Parts
Sales $10,000,000-$50,000,000
# of Employees 465
Plant Area (Sq.Ft.) 177,600
Annual Production 3,500,000 Pieces
Production Hrs. Annual 6,240
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $371,622 9,557,444 kWh $0.04
Electricity Demand $231,426 19,838 kW-months/year $11.67
Electricity Fees $13,230 - $ -
Natural Gas $31,659 6,800 MMBtu $4.66
TOTAL ENERGY COSTS $657,821
RECOMMENDED SAVINGS* $58,010 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $13,941
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Solid Waste (non-haz) Personnel Changes Electricity Usage Electricity Demand Natural Gas Water Disposal Solid Waste (non-haz) Personnel Changes
$ kWh $ kW-months/year $ MMBtu $ Tgal $ lb $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$11,002
Cost:
$27,440
$6,977 179,367 $4,025 345 - - - - - - - - $6,977
179,367
kWh
$4,025
345
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
02: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$2,901
Cost:
$1,050
$1,845 47,479 $1,056 91 - - - - - - - - $1,845
47,479
kWh
$1,056
91
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$2,923
Cost:
$8,000
$2,252 58,030 $671 58 - - - - - - - - $2,252
58,030
kWh
$671
58
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
04: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$2,514
Cost:
$4,000
$2,913 75,029 $1,008 86 $(-1,407) (-354) - - - - - - $2,913
75,029
kWh
$1,008
86
kW-months/year
$(-1,407)
(-354)
MMBtu
-
-
Tgal
-
-
lb
-
-
$
05: 2.7231 USE RADIANT HEATER FOR SPOT HEATING Savings:
$1,339
Cost:
$1,600
$254 6,448 $74 8 $1,011 254 - - - - - - $254
6,448
kWh
$74
8
kW-months/year
$1,011
254
MMBtu
-
-
Tgal
-
-
lb
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$707
Cost:
$900
$385 9,965 $322 28 - - - - - - - - $385
9,965
kWh
$322
28
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
07: 3.4111 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION Savings:
$2,232
Cost:
$4,200
- - - - - - $2,232 794,430 - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$2,232
794,430
Tgal
-
-
lb
-
-
$
08: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$2,217
Cost:
$7,000
- - - - - - - - $2,217 393,600 - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
$2,217
393,600
lb
-
-
$
09: 3.4151 MINIMIZE WATER USAGE Savings:
$1,215
Cost:
$3,125
- - - - - - $1,215 432,250 - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$1,215
432,250
Tgal
-
-
lb
-
-
$
10: 4.445 INSTALL EQUIPMENT TO MOVE PRODUCT Savings:
$30,960
Cost:
$50,000
- - - - - - - - - - $30,960 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
$30,960
-
$
TOTAL RECOMMENDED Savings:
$58,010
Cost:
$107,315
$14,626 376,318 $7,156 616 $(-396) (-100) $3,447 1,226,680 $2,217 393,600 $30,960 - $14,626
376,318
kWh
$7,156
616
kW-months/year
$(-396)
(-100)
MMBtu
$3,447
1,226,680
Tgal
$2,217
393,600
lb
$30,960
-
$
TOTAL IMPLEMENTED Savings:
$13,941
Cost:
$32,540
$7,362 189,332 $4,347 373 - - $2,232 794,430 - - - - $7,362
189,332
kWh
$4,347
373
kW-months/year
-
-
MMBtu
$2,232
794,430
Tgal
-
-
lb
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ lb $ $
Electricity Usage Electricity Demand Natural Gas Water Disposal Solid Waste (non-haz) Personnel Changes Electricity Usage Electricity Demand Natural Gas Water Disposal Solid Waste (non-haz) Personnel Changes