IAC logo
IAC Assessment: BD0134
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: BD0134
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Bradley University
Assessment Year 1999
Principal Product Electrical Transducers for Hearing Aids
NAICS n/a
SIC 3679 - Electronic Components, Nec
Sales $5,000,000-$10,000,000
# of Employees 220
Plant Area (Sq.Ft.) 50,000
Annual Production 4,000,000 Pieces
Production Hrs. Annual 6,240
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $134,465 3,650,059 kWh $0.04
Electricity Demand $80,757 6,576 kW-months/year $12.28
Electricity Fees $709 - $ -
Natural Gas $9,505 2,498 MMBtu $3.81
TOTAL ENERGY COSTS $233,051
RECOMMENDED SAVINGS* $574,738 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $1,784
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Water Disposal Solid Waste (non-haz) Personnel Changes Electricity Usage Electricity Demand Water Disposal Solid Waste (non-haz) Personnel Changes
$ kWh $ kW-months/year $ Tgal $ lb $ $
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$2,126
Cost:
$2,650
$1,519 43,376 $607 49 - - - - - - $1,519
43,376
kWh
$607
49
kW-months/year
-
-
Tgal
-
-
lb
-
-
$
02: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,819
Cost:
$1,000
$1,178 33,705 $641 52 - - - - - - $1,178
33,705
kWh
$641
52
kW-months/year
-
-
Tgal
-
-
lb
-
-
$
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,522
Cost:
-
$910 25,791 $612 50 - - - - - - $910
25,791
kWh
$612
50
kW-months/year
-
-
Tgal
-
-
lb
-
-
$
04: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,179
Cost:
$1,275
$683 19,637 $496 40 - - - - - - $683
19,637
kWh
$496
40
kW-months/year
-
-
Tgal
-
-
lb
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$605
Cost:
$1,155
$409 11,723 $196 16 - - - - - - $409
11,723
kWh
$196
16
kW-months/year
-
-
Tgal
-
-
lb
-
-
$
06: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$2,690
Cost:
$7,000
- - - - - - $2,690 188,600 - - -
-
kWh
-
-
kW-months/year
-
-
Tgal
$2,690
188,600
lb
-
-
$
07: 3.4111 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION Savings:
$1,037
Cost:
$4,000
- - - - $1,037 260,000 - - - - -
-
kWh
-
-
kW-months/year
$1,037
260,000
Tgal
-
-
lb
-
-
$
08: 4.4460 AUTOMATE FINISHING PROCESS Savings:
$439,280
Cost:
$825,000
- - - - - - - - $439,280 - -
-
kWh
-
-
kW-months/year
-
-
Tgal
-
-
lb
$439,280
-
$
09: 4.4460 AUTOMATE FINISHING PROCESS Savings:
$124,480
Cost:
$400,000
- - - - - - - - $124,480 - -
-
kWh
-
-
kW-months/year
-
-
Tgal
-
-
lb
$124,480
-
$
TOTAL RECOMMENDED Savings:
$574,738
Cost:
$1,242,080
$4,699 134,232 $2,552 207 $1,037 260,000 $2,690 188,600 $563,760 - $4,699
134,232
kWh
$2,552
207
kW-months/year
$1,037
260,000
Tgal
$2,690
188,600
lb
$563,760
-
$
TOTAL IMPLEMENTED Savings:
$1,784
Cost:
$2,430
$1,092 31,360 $692 56 - - - - - - $1,092
31,360
kWh
$692
56
kW-months/year
-
-
Tgal
-
-
lb
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ Tgal $ lb $ $
Electricity Usage Electricity Demand Water Disposal Solid Waste (non-haz) Personnel Changes Electricity Usage Electricity Demand Water Disposal Solid Waste (non-haz) Personnel Changes