IAC logo
IAC Assessment: BD0145
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: BD0145
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Bradley University
Assessment Year 1999
Principal Product Graduation Apparel, Choir Robes
NAICS n/a
SIC 2384 - Robes And Dressing Gowns
Sales $10,000,000-$50,000,000
# of Employees 275
Plant Area (Sq.Ft.) 325,000
Annual Production 2,000,000 Pounds
Production Hrs. Annual 2,210
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $203,698 2,392,438 kWh $0.09
Electricity Demand $76,142 7,833 kW-months/year $9.72
Electricity Fees $16,991 - $ -
Natural Gas $68,899 27,291 MMBtu $2.52
TOTAL ENERGY COSTS $395,430
RECOMMENDED SAVINGS* $164,417 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $143,895
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Water Disposal Other Liquid (non-haz) Increase in Production Electricity Usage Electricity Demand Water Disposal Other Liquid (non-haz) Increase in Production
$ kWh $ kW-months/year $ Tgal $ gal $ %
01: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$11,690
Cost:
$13,200
$5,103 121,630 $6,587 678 - - - - - - $5,103
121,630
kWh
$6,587
678
kW-months/year
-
-
Tgal
-
-
gal
-
-
%
02: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$3,654
Cost:
$6,000
$3,654 487,691 - - - - - - - - $3,654
487,691
kWh
-
-
kW-months/year
-
-
Tgal
-
-
gal
-
-
%
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,755
Cost:
$6,000
$799 19,050 $956 98 - - - - - - $799
19,050
kWh
$956
98
kW-months/year
-
-
Tgal
-
-
gal
-
-
%
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$632
Cost:
$600
$279 6,741 $353 36 - - - - - - $279
6,741
kWh
$353
36
kW-months/year
-
-
Tgal
-
-
gal
-
-
%
05: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$408
Cost:
$890
$210 4,982 $198 20 - - - - - - $210
4,982
kWh
$198
20
kW-months/year
-
-
Tgal
-
-
gal
-
-
%
06: 3.4114 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER Savings:
$11,371
Cost:
$31,000
- - - - $11,371 8,485,462 - - - - -
-
kWh
-
-
kW-months/year
$11,371
8,485,462
Tgal
-
-
gal
-
-
%
07: 3.5314 USE IN-PROCESS RECYCLING WHENEVER POSSIBLE Savings:
$3,002
Cost:
$11,500
- - - - - - $3,002 2,933 - - -
-
kWh
-
-
kW-months/year
-
-
Tgal
$3,002
2,933
gal
-
-
%
08: 4.111 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$125,756
Cost:
$200,000
- - - - - - - - $125,756 - -
-
kWh
-
-
kW-months/year
-
-
Tgal
-
-
gal
$125,756
-
%
09: 3.2176 INCREASE USE OF AUTOMATION Savings:
$6,149
Cost:
$26,000
- - - - - - - - $6,149 - -
-
kWh
-
-
kW-months/year
-
-
Tgal
-
-
gal
$6,149
-
%
TOTAL RECOMMENDED Savings:
$164,417
Cost:
$295,190
$10,045 640,094 $8,094 832 $11,371 8,485,462 $3,002 2,933 $131,905 - $10,045
640,094
kWh
$8,094
832
kW-months/year
$11,371
8,485,462
Tgal
$3,002
2,933
gal
$131,905
-
%
TOTAL IMPLEMENTED Savings:
$143,895
Cost:
$226,690
$10,045 640,094 $8,094 832 - - - - $125,756 - $10,045
640,094
kWh
$8,094
832
kW-months/year
-
-
Tgal
-
-
gal
$125,756
-
%
Savings
Cost
$ kWh $ kW-months/year $ Tgal $ gal $ %
Electricity Usage Electricity Demand Water Disposal Other Liquid (non-haz) Increase in Production Electricity Usage Electricity Demand Water Disposal Other Liquid (non-haz) Increase in Production