IAC logo
IAC Assessment: BD0149
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: BD0149
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Bradley University
Assessment Year 1999
Principal Product Precision Machined parts
NAICS n/a
SIC 3599 - Industrial Machinery, Nec
Sales $5,000,000-$10,000,000
# of Employees 70
Plant Area (Sq.Ft.) 50,000
Annual Production 4,000,000 Pounds
Production Hrs. Annual 6,240
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $51,307 1,089,683 kWh $0.05
Electricity Demand $20,830 2,672 kW-months/year $7.80
Electricity Fees $8,723 - $ -
Natural Gas $7,764 1,914 MMBtu $4.06
TOTAL ENERGY COSTS $88,624
RECOMMENDED SAVINGS* $85,553 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Primary Product Electricity Usage Electricity Demand Natural Gas Personnel Changes Primary Product
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$7,642
Cost:
$22,260
$5,661 120,164 $1,981 231 - - - - - - $5,661
120,164
kWh
$1,981
231
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,378
Cost:
$2,060
$1,091 23,154 $287 33 - - - - - - $1,091
23,154
kWh
$287
33
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,154
Cost:
$1,125
$650 13,775 $504 59 - - - - - - $650
13,775
kWh
$504
59
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
04: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$1,016
Cost:
$1,250
- - - - $1,016 260 - - - - -
-
kWh
-
-
kW-months/year
$1,016
260
MMBtu
-
-
$
-
-
$
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$561
Cost:
-
$415 8,792 $146 17 - - - - - - $415
8,792
kWh
$146
17
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$294
Cost:
$350
$218 4,689 $76 9 - - - - - - $218
4,689
kWh
$76
9
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
07: 4.521 CLEAR AND RENT EXISTING SPACE Savings:
$56,400
Cost:
$2,500
- - - - - - - - $56,400 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
$56,400
-
$
08: 4.323 OPTIMIZE LOT SIZES TO REDUCE INVENTORY CARRYING COSTS Savings:
$9,100
Cost:
-
- - - - - - - - $9,100 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
$9,100
-
$
09: 4.513 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS Savings:
$8,008
Cost:
$10,000
- - - - - - $8,008 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$8,008
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$85,553
Cost:
$39,545
$8,035 170,574 $2,994 349 $1,016 260 $8,008 - $65,500 - $8,035
170,574
kWh
$2,994
349
kW-months/year
$1,016
260
MMBtu
$8,008
-
$
$65,500
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Primary Product Electricity Usage Electricity Demand Natural Gas Personnel Changes Primary Product