Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Bradley University |
---|---|
Assessment Year | 1999 |
Principal Product | Precision Machined parts |
NAICS | n/a |
SIC | 3599 - Industrial Machinery, Nec |
Sales | $5,000,000-$10,000,000 |
# of Employees | 70 |
Plant Area (Sq.Ft.) | 50,000 |
Annual Production | 4,000,000 Pounds |
Production Hrs. Annual | 6,240 |
Location (State) | IL |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $51,307 | 1,089,683 | kWh | $0.05 |
Electricity Demand | $20,830 | 2,672 | kW-months/year | $7.80 |
Electricity Fees | $8,723 | - | $ | - |
Natural Gas | $7,764 | 1,914 | MMBtu | $4.06 |
TOTAL ENERGY COSTS | $88,624 | |||
RECOMMENDED SAVINGS* | $85,553 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Primary Product | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Primary Product | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $7,642 Cost: $22,260 |
$5,661 | 120,164 | $1,981 | 231 | - | - | - | - | - | - |
$5,661 120,164 kWh |
$1,981 231 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $1,378 Cost: $2,060 |
$1,091 | 23,154 | $287 | 33 | - | - | - | - | - | - |
$1,091 23,154 kWh |
$287 33 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $1,154 Cost: $1,125 |
$650 | 13,775 | $504 | 59 | - | - | - | - | - | - |
$650 13,775 kWh |
$504 59 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $1,016 Cost: $1,250 |
- | - | - | - | $1,016 | 260 | - | - | - | - |
- - kWh |
- - kW-months/year |
$1,016 260 MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $561 Cost: - |
$415 | 8,792 | $146 | 17 | - | - | - | - | - | - |
$415 8,792 kWh |
$146 17 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $294 Cost: $350 |
$218 | 4,689 | $76 | 9 | - | - | - | - | - | - |
$218 4,689 kWh |
$76 9 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 4.521 CLEAR AND RENT EXISTING SPACE |
Savings: $56,400 Cost: $2,500 |
- | - | - | - | - | - | - | - | $56,400 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
$56,400 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 4.323 OPTIMIZE LOT SIZES TO REDUCE INVENTORY CARRYING COSTS |
Savings: $9,100 Cost: - |
- | - | - | - | - | - | - | - | $9,100 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
$9,100 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 4.513 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS |
Savings: $8,008 Cost: $10,000 |
- | - | - | - | - | - | $8,008 | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$8,008 - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $85,553 Cost: $39,545 |
$8,035 | 170,574 | $2,994 | 349 | $1,016 | 260 | $8,008 | - | $65,500 | - | $8,035 170,574 kWh |
$2,994 349 kW-months/year |
$1,016 260 MMBtu |
$8,008 - $ |
$65,500 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - | - | - | - | - - kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Primary Product | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Primary Product |