IAC logo
IAC Assessment: BD0156
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: BD0156
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Bradley University
Assessment Year 2000
Principal Product Concrete Batch Plants
NAICS n/a
SIC 3531 - Construction Machinery
Sales $10,000,000-$50,000,000
# of Employees 105
Plant Area (Sq.Ft.) 86,000
Annual Production 3,900,000 Pounds
Production Hrs. Annual 5,252
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $54,534 1,989,742 kWh $0.03
Electricity Demand $3,898 2,228 kW-months/year $1.75
Electricity Fees $5,824 - $ -
Natural Gas $44,320 13,364 MMBtu $3.32
TOTAL ENERGY COSTS $110,582
RECOMMENDED SAVINGS* $38,122 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $3,472
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Administrative Changes Primary Raw Material Primary Product By-product Production Electricity Usage Electricity Demand Natural Gas Administrative Changes Primary Raw Material Primary Product By-product Production
$ kWh $ kW-months/year $ MMBtu $ $ $ $ $ $ $ $
01: 2.7231 USE RADIANT HEATER FOR SPOT HEATING Savings:
$12,223
Cost:
$40,500
$1,820 46,893 $125 71 $10,278 3,826 - - - - - - - - $1,820
46,893
kWh
$125
71
kW-months/year
$10,278
3,826
MMBtu
-
-
$
-
-
$
-
-
$
-
-
$
02: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$2,732
Cost:
$7,350
- - - - $2,732 1,255 - - - - - - - - -
-
kWh
-
-
kW-months/year
$2,732
1,255
MMBtu
-
-
$
-
-
$
-
-
$
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,358
Cost:
$6,095
$1,908 47,773 $191 109 - - $125 - $134 - - - - - $1,908
47,773
kWh
$191
109
kW-months/year
-
-
MMBtu
$125
-
$
$134
-
$
-
-
$
-
-
$
04: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,749
Cost:
$3,340
$1,627 40,739 $122 70 - - - - - - - - - - $1,627
40,739
kWh
$122
70
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,167
Cost:
$821
$1,035 25,791 $132 75 - - - - - - - - - - $1,035
25,791
kWh
$132
75
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
-
-
$
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$321
Cost:
$800
$292 7,327 $29 17 - - - - - - - - - - $292
7,327
kWh
$29
17
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
-
-
$
07: 4.521 CLEAR AND RENT EXISTING SPACE Savings:
$14,100
Cost:
$20,000
- - - - - - - - - - $14,100 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
$14,100
-
$
-
-
$
08: 4.421 MODIFY CURRENT INCENTIVE PROGRAM Savings:
$2,990
Cost:
$7,000
- - - - - - - - - - - - $2,990 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
$2,990
-
$
09: 4.821 PAY BILLS ON TIME TO AVOID LATE FEES Savings:
$482
Cost:
-
- - - - - - - - - - $482 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
$482
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$38,122
Cost:
$85,906
$6,682 168,523 $599 342 $13,010 5,081 $125 - $134 - $14,582 - $2,990 - $6,682
168,523
kWh
$599
342
kW-months/year
$13,010
5,081
MMBtu
$125
-
$
$134
-
$
$14,582
-
$
$2,990
-
$
TOTAL IMPLEMENTED Savings:
$3,472
Cost:
$7,000
- - - - - - - - - - $482 - $2,990 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
$482
-
$
$2,990
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $ $ $ $ $
Electricity Usage Electricity Demand Natural Gas Administrative Changes Primary Raw Material Primary Product By-product Production Electricity Usage Electricity Demand Natural Gas Administrative Changes Primary Raw Material Primary Product By-product Production