IAC logo
IAC Assessment: BD0172
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: BD0172
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Bradley University
Assessment Year 2000
Principal Product Promotional Stamps
NAICS n/a
SIC 2752 - Commercial Printing, Lithographic
Sales $5,000,000-$10,000,000
# of Employees 20
Plant Area (Sq.Ft.) 54,000
Annual Production 5,000,000 Pounds
Production Hrs. Annual 2,216
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $143,735 2,157,093 kWh $0.07
Electricity Demand $24,000 10,852 kW-months/year $2.21
Electricity Fees $180 - $ -
Natural Gas $30,496 6,414 MMBtu $4.75
TOTAL ENERGY COSTS $209,875
RECOMMENDED SAVINGS* $87,351 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost Primary Product Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost Primary Product
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,601
Cost:
$4,250
$1,331 19,930 $270 122 - - - - - - $1,331
19,930
kWh
$270
122
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,429
Cost:
$600
$1,211 18,171 $218 99 - - - - - - $1,211
18,171
kWh
$218
99
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$771
Cost:
$1,425
$638 9,672 $133 60 - - - - - - $638
9,672
kWh
$133
60
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
04: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$493
Cost:
$500
- - - - $493 104 - - - - -
-
kWh
-
-
kW-months/year
$493
104
MMBtu
-
-
$
-
-
$
05: 2.1222 INSTALL TURBULATORS Savings:
$370
Cost:
$800
- - - - $370 78 - - - - -
-
kWh
-
-
kW-months/year
$370
78
MMBtu
-
-
$
-
-
$
06: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$314
Cost:
$1,000
- - - - $314 73 - - - - -
-
kWh
-
-
kW-months/year
$314
73
MMBtu
-
-
$
-
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$258
Cost:
$235
$155 2,345 $7 3 - - $96 - - - $155
2,345
kWh
$7
3
kW-months/year
-
-
MMBtu
$96
-
$
-
-
$
08: 4.5210 CLEAR AND RENT EXISTING SPACE Savings:
$54,000
Cost:
$1,000
- - - - - - - - $54,000 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
$54,000
-
$
09: 4.1110 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$26,555
Cost:
$5,000
- - - - - - $26,555 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$26,555
-
$
-
-
$
10: 4.4410 INSTALL AUTOMATIC PACKING EQUIPMENT Savings:
$1,560
Cost:
$1,300
- - - - - - - - $1,560 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
$1,560
-
$
TOTAL RECOMMENDED Savings:
$87,351
Cost:
$16,110
$3,335 50,118 $628 284 $1,177 255 $26,651 - $55,560 - $3,335
50,118
kWh
$628
284
kW-months/year
$1,177
255
MMBtu
$26,651
-
$
$55,560
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost Primary Product Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost Primary Product