IAC Assessment: BD0178
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: BD0178
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Bradley University
Assessment Year 2001
Principal Product Aluminum and Zinc Die Castings
NAICS n/a
SIC 3363 - Aluminum Die-castings
Sales $10,000,000-$50,000,000
# of Employees 150
Plant Area (Sq.Ft.) 82,200
Annual Production 8,000,000 Pounds
Production Hrs. Annual 6,240
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $341,934 9,122,802 kWh $0.04
Electricity Demand $276,339 19,707 kW-months/year $14.02
Electricity Fees $6,444 - $ -
Natural Gas $44,986 13,576 MMBtu $3.31
TOTAL ENERGY COSTS $700,177
RECOMMENDED SAVINGS* $39,343 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $28,605
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Water Disposal Solid Waste (non-haz) One-time Revenue or Avoided Cost Primary Product Electricity Usage Electricity Demand Water Disposal Solid Waste (non-haz) One-time Revenue or Avoided Cost Primary Product
$ kWh $ kW-months/year $ Tgal $ lb $ $ $ $
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$6,764
Cost:
$9,860
$4,383 116,940 $2,381 170 - - - - - - - - $4,383
116,940
kWh
$2,381
170
kW-months/year
-
-
Tgal
-
-
lb
-
-
$
-
-
$
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$4,182
Cost:
-
$2,437 65,064 $1,745 125 - - - - - - - - $2,437
65,064
kWh
$1,745
125
kW-months/year
-
-
Tgal
-
-
lb
-
-
$
-
-
$
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$2,842
Cost:
$1,800
$1,155 30,774 $1,687 120 - - - - - - - - $1,155
30,774
kWh
$1,687
120
kW-months/year
-
-
Tgal
-
-
lb
-
-
$
-
-
$
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$2,230
Cost:
$1,000
$1,299 34,584 $931 66 - - - - - - - - $1,299
34,584
kWh
$931
66
kW-months/year
-
-
Tgal
-
-
lb
-
-
$
-
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,341
Cost:
$400
$781 20,809 $560 40 - - - - - - - - $781
20,809
kWh
$560
40
kW-months/year
-
-
Tgal
-
-
lb
-
-
$
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$526
Cost:
$488
$193 5,275 $333 24 - - - - - - - - $193
5,275
kWh
$333
24
kW-months/year
-
-
Tgal
-
-
lb
-
-
$
-
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$130
Cost:
$172
$50 1,465 $25 2 - - - - $55 - - - $50
1,465
kWh
$25
2
kW-months/year
-
-
Tgal
-
-
lb
$55
-
$
-
-
$
08: 3.3131 USE EVAPORATION TO CONCENTRATE MATERIAL Savings:
$20,240
Cost:
$3,600
- - - - $20,240 33,696 - - - - - - -
-
kWh
-
-
kW-months/year
$20,240
33,696
Tgal
-
-
lb
-
-
$
-
-
$
09: 3.5217 REUSE / RECYCLE/ SELL PAPER PRODUCTS Savings:
$551
Cost:
$200
- - - - - - $551 1 - - - - -
-
kWh
-
-
kW-months/year
-
-
Tgal
$551
1
lb
-
-
$
-
-
$
10: 4.821 PAY BILLS ON TIME TO AVOID LATE FEES Savings:
$537
Cost:
-
- - - - - - - - - - $537 - -
-
kWh
-
-
kW-months/year
-
-
Tgal
-
-
lb
-
-
$
$537
-
$
TOTAL RECOMMENDED Savings:
$39,343
Cost:
$17,520
$10,298 274,911 $7,662 547 $20,240 33,696 $551 1 $55 - $537 - $10,298
274,911
kWh
$7,662
547
kW-months/year
$20,240
33,696
Tgal
$551
1
lb
$55
-
$
$537
-
$
TOTAL IMPLEMENTED Savings:
$28,605
Cost:
$5,800
$4,373 116,647 $3,992 285 $20,240 33,696 - - - - - - $4,373
116,647
kWh
$3,992
285
kW-months/year
$20,240
33,696
Tgal
-
-
lb
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ Tgal $ lb $ $ $ $
Electricity Usage Electricity Demand Water Disposal Solid Waste (non-haz) One-time Revenue or Avoided Cost Primary Product Electricity Usage Electricity Demand Water Disposal Solid Waste (non-haz) One-time Revenue or Avoided Cost Primary Product