IAC logo
IAC Assessment: BD0196
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: BD0196
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Bradley University
Assessment Year 2001
Principal Product Heavy Construction Nuts and Bolts
NAICS n/a
SIC 3452 - Bolts, Nuts, Rivets, And Washers
Sales $10,000,000-$50,000,000
# of Employees 200
Plant Area (Sq.Ft.) 200,000
Annual Production 35,000,000 Pounds
Production Hrs. Annual 8,760
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $280,348 11,213,920 kWh $0.03
Electricity Demand $188,527 34,277 kW-months/year $5.50
Electricity Fees $23,442 - $ -
Natural Gas $345,807 50,934 MMBtu $6.79
TOTAL ENERGY COSTS $863,636
RECOMMENDED SAVINGS* $84,893 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $5,323
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Solid Waste (non-haz) One-time Revenue or Avoided Cost By-product Production Electricity Usage Electricity Demand Natural Gas Water Disposal Solid Waste (non-haz) One-time Revenue or Avoided Cost By-product Production
$ kWh $ kW-months/year $ MMBtu $ Tgal $ lb $ $ $ $
01: 2.7231 USE RADIANT HEATER FOR SPOT HEATING Savings:
$41,697
Cost:
$18,000
- - - - $41,697 6,061 - - - - - - - - -
-
kWh
-
-
kW-months/year
$41,697
6,061
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
$
02: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$3,026
Cost:
$2,250
$2,326 93,037 $700 127 - - - - - - - - - - $2,326
93,037
kWh
$700
127
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
$
03: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$1,892
Cost:
$900
$1,454 58,148 $438 80 - - - - - - - - - - $1,454
58,148
kWh
$438
80
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,477
Cost:
$200
$1,135 45,398 $342 62 - - - - - - - - - - $1,135
45,398
kWh
$342
62
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
$
05: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,004
Cost:
$3,780
$725 28,989 $279 51 - - - - - - - - - - $725
28,989
kWh
$279
51
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
$
06: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$984
Cost:
$1,725
$583 23,323 $401 73 - - - - - - - - - - $583
23,323
kWh
$401
73
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$754
Cost:
$1,260
$502 20,077 $257 190 - - - - - - $(-5) - - - $502
20,077
kWh
$257
190
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
$(-5)
-
$
-
-
$
08: 3.3131 USE EVAPORATION TO CONCENTRATE MATERIAL Savings:
$19,775
Cost:
$27,000
- - - - - - $19,775 97,200 - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$19,775
97,200
Tgal
-
-
lb
-
-
$
-
-
$
09: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$5,282
Cost:
$7,000
- - - - - - - - $5,282 62 - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
$5,282
62
lb
-
-
$
-
-
$
10: 3.4154 ELIMINATE LEAKS IN WATER LINES AND VALVES Savings:
$2,862
Cost:
$750
- - - - - - $2,862 788,400 - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$2,862
788,400
Tgal
-
-
lb
-
-
$
-
-
$
11: 4.222 PURCHASE RE-CONDITIONED MATERIAL INSTEAD OF NEW Savings:
$6,140
Cost:
$1,000
- - - - - - - - - - - - $6,140 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
$6,140
-
$
TOTAL RECOMMENDED Savings:
$84,893
Cost:
$63,865
$6,725 268,972 $2,417 583 $41,697 6,061 $22,637 885,600 $5,282 62 $(-5) - $6,140 - $6,725
268,972
kWh
$2,417
583
kW-months/year
$41,697
6,061
MMBtu
$22,637
885,600
Tgal
$5,282
62
lb
$(-5)
-
$
$6,140
-
$
TOTAL IMPLEMENTED Savings:
$5,323
Cost:
$2,675
$1,718 68,721 $743 135 - - $2,862 788,400 - - - - - - $1,718
68,721
kWh
$743
135
kW-months/year
-
-
MMBtu
$2,862
788,400
Tgal
-
-
lb
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ lb $ $ $ $
Electricity Usage Electricity Demand Natural Gas Water Disposal Solid Waste (non-haz) One-time Revenue or Avoided Cost By-product Production Electricity Usage Electricity Demand Natural Gas Water Disposal Solid Waste (non-haz) One-time Revenue or Avoided Cost By-product Production