IAC logo
IAC Assessment: BD0202
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: BD0202
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Bradley University
Assessment Year 2002
Principal Product Industrial Metal Fasteners
NAICS n/a
SIC 3452 - Bolts, Nuts, Rivets, And Washers
Sales $10,000,000-$50,000,000
# of Employees 128
Plant Area (Sq.Ft.) 500,000
Annual Production 450,000,000 Pieces
Production Hrs. Annual 8,760
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $293,971 8,294,040 kWh $0.04
Electricity Demand $203,299 18,554 kW-months/year $10.96
Electricity Fees $360 - $ -
Natural Gas $737,628 118,486 MMBtu $6.23
TOTAL ENERGY COSTS $1,303,696
RECOMMENDED SAVINGS* $171,285 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Other Liquid (non-haz) Administrative Changes One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas Water Disposal Other Liquid (non-haz) Administrative Changes One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ gal $ $ $ $
01: 2.7231 USE RADIANT HEATER FOR SPOT HEATING Savings:
$90,110
Cost:
$47,000
- - - - $90,110 13,632 - - - - - - - - -
-
kWh
-
-
kW-months/year
$90,110
13,632
MMBtu
-
-
Tgal
-
-
gal
-
-
$
-
-
$
02: 2.2426 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR Savings:
$10,572
Cost:
$25,000
- - - - $10,572 1,599 - - - - - - - - -
-
kWh
-
-
kW-months/year
$10,572
1,599
MMBtu
-
-
Tgal
-
-
gal
-
-
$
-
-
$
03: 2.1222 INSTALL TURBULATORS Savings:
$7,093
Cost:
$1,200
- - - - $7,093 1,073 - - - - - - - - -
-
kWh
-
-
kW-months/year
$7,093
1,073
MMBtu
-
-
Tgal
-
-
gal
-
-
$
-
-
$
04: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$6,166
Cost:
$3,000
$3,257 91,993 $2,909 265 - - - - - - - - - - $3,257
91,993
kWh
$2,909
265
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
gal
-
-
$
-
-
$
05: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$5,720
Cost:
$14,230
$3,395 95,911 $2,325 212 - - - - - - - - - - $3,395
95,911
kWh
$2,325
212
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
gal
-
-
$
-
-
$
06: 2.1213 DIRECT WARMEST AIR TO COMBUSTION INTAKE Savings:
$4,357
Cost:
$6,000
- - - - $4,357 659 - - - - - - - - -
-
kWh
-
-
kW-months/year
$4,357
659
MMBtu
-
-
Tgal
-
-
gal
-
-
$
-
-
$
07: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,945
Cost:
$2,300
$1,028 29,079 $917 84 - - - - - - - - - - $1,028
29,079
kWh
$917
84
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
gal
-
-
$
-
-
$
08: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,490
Cost:
$1,350
$405 11,423 $1,085 99 - - - - - - - - - - $405
11,423
kWh
$1,085
99
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
gal
-
-
$
-
-
$
09: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,068
Cost:
$2,150
$518 14,640 $218 20 - - - - - - - - $332 - $518
14,640
kWh
$218
20
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
gal
-
-
$
$332
-
$
10: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$550
Cost:
$540
$212 5,992 $90 8 - - - - - - - - $248 - $212
5,992
kWh
$90
8
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
gal
-
-
$
$248
-
$
11: 3.3131 USE EVAPORATION TO CONCENTRATE MATERIAL Savings:
$27,967
Cost:
$10,000
- - - - - - - - $27,967 - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
$27,967
-
gal
-
-
$
-
-
$
12: 3.4115 RECOVER AND REUSE COOLING WATER Savings:
$3,392
Cost:
$12,000
- - - - - - $3,392 2,221,440 - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$3,392
2,221,440
Tgal
-
-
gal
-
-
$
-
-
$
13: 4.8210 PAY BILLS ON TIME TO AVOID LATE FEES Savings:
$10,555
Cost:
-
- - - - - - - - - - $10,555 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
gal
$10,555
-
$
-
-
$
14: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY Savings:
$300
Cost:
$500
- - - - - - - - - - - - $300 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
gal
-
-
$
$300
-
$
TOTAL RECOMMENDED Savings:
$171,285
Cost:
$125,270
$8,815 249,038 $7,544 688 $112,132 16,963 $3,392 2,221,440 $27,967 - $10,555 - $880 - $8,815
249,038
kWh
$7,544
688
kW-months/year
$112,132
16,963
MMBtu
$3,392
2,221,440
Tgal
$27,967
-
gal
$10,555
-
$
$880
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
gal
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ gal $ $ $ $
Electricity Usage Electricity Demand Natural Gas Water Disposal Other Liquid (non-haz) Administrative Changes One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas Water Disposal Other Liquid (non-haz) Administrative Changes One-time Revenue or Avoided Cost