IAC logo
IAC Assessment: BD0203
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: BD0203
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Bradley University
Assessment Year 2002
Principal Product Metal Stamping Assemblies
NAICS n/a
SIC 3469 - Metal Stampings, Nec
Sales $5,000,000-$10,000,000
# of Employees 60
Plant Area (Sq.Ft.) 70,000
Annual Production 150,000 Pieces
Production Hrs. Annual 2,210
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $99,659 1,179,708 kWh $0.08
Electricity Fees $1,117 - $ -
Natural Gas $28,367 3,088 MMBtu $9.19
TOTAL ENERGY COSTS $130,338
RECOMMENDED SAVINGS* $14,338 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $14,338
#|Description Savings
Cost
Status Electricity Usage Natural Gas Water Disposal One-time Revenue or Avoided Cost Electricity Usage Natural Gas Water Disposal One-time Revenue or Avoided Cost
$ kWh $ MMBtu $ Tgal $ $
01: 2.7231 USE RADIANT HEATER FOR SPOT HEATING Savings:
$5,734
Cost:
$6,000
- - $5,734 634 - - - - -
-
kWh
$5,734
634
MMBtu
-
-
Tgal
-
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,911
Cost:
$1,300
$2,911 34,457 - - - - - - $2,911
34,457
kWh
-
-
MMBtu
-
-
Tgal
-
-
$
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,611
Cost:
$4,440
$1,611 19,060 - - - - - - $1,611
19,060
kWh
-
-
MMBtu
-
-
Tgal
-
-
$
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,008
Cost:
$400
$1,008 11,932 - - - - - - $1,008
11,932
kWh
-
-
MMBtu
-
-
Tgal
-
-
$
05: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$517
Cost:
$840
$517 6,122 - - - - - - $517
6,122
kWh
-
-
MMBtu
-
-
Tgal
-
-
$
06: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$429
Cost:
$975
$429 5,070 - - - - - - $429
5,070
kWh
-
-
MMBtu
-
-
Tgal
-
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$212
Cost:
$175
$141 1,664 - - - - $71 - $141
1,664
kWh
-
-
MMBtu
-
-
Tgal
$71
-
$
08: 3.4151 MINIMIZE WATER USAGE Savings:
$753
Cost:
$690
- - - - $753 140,400 - - -
-
kWh
-
-
MMBtu
$753
140,400
Tgal
-
-
$
09: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY Savings:
$850
Cost:
$100
- - - - - - $850 - -
-
kWh
-
-
MMBtu
-
-
Tgal
$850
-
$
10: 4.8210 PAY BILLS ON TIME TO AVOID LATE FEES Savings:
$313
Cost:
-
- - - - - - $313 - -
-
kWh
-
-
MMBtu
-
-
Tgal
$313
-
$
TOTAL RECOMMENDED Savings:
$14,338
Cost:
$14,920
$6,617 78,305 $5,734 634 $753 140,400 $1,234 - $6,617
78,305
kWh
$5,734
634
MMBtu
$753
140,400
Tgal
$1,234
-
$
TOTAL IMPLEMENTED Savings:
$14,338
Cost:
$14,920
$6,617 78,305 $5,734 634 $753 140,400 $1,234 - $6,617
78,305
kWh
$5,734
634
MMBtu
$753
140,400
Tgal
$1,234
-
$
Savings
Cost
$ kWh $ MMBtu $ Tgal $ $
Electricity Usage Natural Gas Water Disposal One-time Revenue or Avoided Cost Electricity Usage Natural Gas Water Disposal One-time Revenue or Avoided Cost