IAC Assessment: BD0224
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: BD0224
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Bradley University
Assessment Year 2003
Principal Product Spring Wire
NAICS 331222 - Steel Wire Drawing
SIC 3315 - Steel Wire And Related Products
Sales $10,000,000-$50,000,000
# of Employees 400
Plant Area (Sq.Ft.) 200,000
Annual Production 50,000,000 Pounds
Production Hrs. Annual 8,400
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $332,342 8,676,688 kWh $0.04
Electricity Demand $244,362 17,364 kW-months/year $14.07
Electricity Fees $5,756 - $ -
Natural Gas $398,510 119,751 MMBtu $3.33
TOTAL ENERGY COSTS $999,687
RECOMMENDED SAVINGS* $48,016 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $19,688
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes Ancillary Material Cost One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes Ancillary Material Cost One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $ $ $ $ $
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$4,628
Cost:
$6,878
$3,324 86,803 $1,304 94 - - - - - - - - - - $3,324
86,803
kWh
$1,304
94
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
-
-
$
02: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$12,870
Cost:
$3,680
$8,442 220,416 $4,428 315 - - - - - - - - - - $8,442
220,416
kWh
$4,428
315
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
-
-
$
03: 2.1133 ADJUST BURNERS FOR EFFICIENT OPERATION Savings:
$3,945
Cost:
$3,300
- - - - $3,945 1,188 - - - - - - - - -
-
kWh
-
-
kW-months/year
$3,945
1,188
MMBtu
-
-
Tgal
-
-
$
-
-
$
-
-
$
04: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$3,413
Cost:
$2,000
$(-215) (-5,600) - - $3,628 1,090 - - - - - - - - $(-215)
(-5,600)
kWh
-
-
kW-months/year
$3,628
1,090
MMBtu
-
-
Tgal
-
-
$
-
-
$
-
-
$
05: 2.1222 INSTALL TURBULATORS Savings:
$3,245
Cost:
$1,200
- - - - $3,245 975 - - - - - - - - -
-
kWh
-
-
kW-months/year
$3,245
975
MMBtu
-
-
Tgal
-
-
$
-
-
$
-
-
$
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$2,574
Cost:
$200
$1,693 44,203 $881 63 - - - - - - - - - - $1,693
44,203
kWh
$881
63
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
-
-
$
07: 2.7145 INSTALL SKYLIGHTS Savings:
$2,459
Cost:
$6,375
$1,048 27,354 $1,411 101 - - - - - - - - - - $1,048
27,354
kWh
$1,411
101
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
-
-
$
08: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,190
Cost:
$1,000
$1,437 37,541 $753 54 - - - - - - - - - - $1,437
37,541
kWh
$753
54
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
-
-
$
09: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,986
Cost:
-
$1,302 33,994 $684 49 - - - - - - - - - - $1,302
33,994
kWh
$684
49
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
-
-
$
10: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,366
Cost:
$600
$880 22,959 $486 35 - - - - - - - - - - $880
22,959
kWh
$486
35
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
-
-
$
11: 2.1133 ADJUST BURNERS FOR EFFICIENT OPERATION Savings:
$1,186
Cost:
$3,200
- - - - $1,186 356 - - - - - - - - -
-
kWh
-
-
kW-months/year
$1,186
356
MMBtu
-
-
Tgal
-
-
$
-
-
$
-
-
$
12: 2.2514 COVER OPEN TANKS Savings:
$479
Cost:
$750
- - - - $479 144 - - - - - - - - -
-
kWh
-
-
kW-months/year
$479
144
MMBtu
-
-
Tgal
-
-
$
-
-
$
-
-
$
13: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$49
Cost:
$265
$115 2,996 $58 4 - - - - $(-52) - $(-72) - - - $115
2,996
kWh
$58
4
kW-months/year
-
-
MMBtu
-
-
Tgal
$(-52)
-
$
$(-72)
-
$
-
-
$
14: 3.4151 MINIMIZE WATER USAGE Savings:
$907
Cost:
$920
- - - - - - $907 560,000 - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$907
560,000
Tgal
-
-
$
-
-
$
-
-
$
15: 4.821 PAY BILLS ON TIME TO AVOID LATE FEES Savings:
$3,969
Cost:
-
- - - - - - - - - - - - $3,969 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
$3,969
-
$
16: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY Savings:
$2,750
Cost:
$1,000
- - - - - - - - - - - - $2,750 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
$2,750
-
$
TOTAL RECOMMENDED Savings:
$48,016
Cost:
$31,368
$18,026 470,666 $10,005 715 $12,483 3,753 $907 560,000 $(-52) - $(-72) - $6,719 - $18,026
470,666
kWh
$10,005
715
kW-months/year
$12,483
3,753
MMBtu
$907
560,000
Tgal
$(-52)
-
$
$(-72)
-
$
$6,719
-
$
TOTAL IMPLEMENTED Savings:
$19,688
Cost:
$11,558
$13,203 344,760 $6,485 463 - - - - - - - - - - $13,203
344,760
kWh
$6,485
463
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $ $ $ $ $
Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes Ancillary Material Cost One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes Ancillary Material Cost One-time Revenue or Avoided Cost