IAC logo
IAC Assessment: BD0244
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: BD0244
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Bradley University
Assessment Year 2003
Principal Product ABS and PVC extruded plastic sheet and ABS laminated sheet
NAICS 326113 - Unlaminated Plastics Film and Sheet (except Packaging) Manufacturing
SIC 3081 - Unsupported Plastics Film & Sheet
Sales $10,000,000-$50,000,000
# of Employees 180
Plant Area (Sq.Ft.) 225,000
Annual Production 20,000,000 Pounds
Production Hrs. Annual 6,240
Location (State) IN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $805,232 18,216,000 kWh $0.04
Electricity Demand $406,307 41,698 kW-months/year $9.74
Natural Gas $377,408 63,695 MMBtu $5.93
TOTAL ENERGY COSTS $1,588,947
RECOMMENDED SAVINGS* $178,043 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $28,283
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Ancillary Material Cost One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Ancillary Material Cost One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $ $ $
01: 2.7231 USE RADIANT HEATER FOR SPOT HEATING Savings:
$53,446
Cost:
$65,000
- - - - $53,446 8,790 - - - - - - - - -
-
kWh
-
-
kW-months/year
$53,446
8,790
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
02: 2.1224 REPLACE BOILER Savings:
$47,120
Cost:
$17,500
- - - - $47,120 7,750 - - - - - - - - -
-
kWh
-
-
kW-months/year
$47,120
7,750
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$24,869
Cost:
$39,515
$16,594 375,435 $8,275 850 - - - - - - - - - - $16,594
375,435
kWh
$8,275
850
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
04: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$6,404
Cost:
$2,550
$4,315 97,622 $2,089 215 - - - - - - - - - - $4,315
97,622
kWh
$2,089
215
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
05: 2.1133 ADJUST BURNERS FOR EFFICIENT OPERATION Savings:
$6,257
Cost:
$2,400
- - - - $6,257 1,067 - - - - - - - - -
-
kWh
-
-
kW-months/year
$6,257
1,067
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
06: 2.1213 DIRECT WARMEST AIR TO COMBUSTION INTAKE Savings:
$5,959
Cost:
$4,000
$(-516) (-11,680) $(-117) (-12) $6,592 1,125 - - - - - - - - $(-516)
(-11,680)
kWh
$(-117)
(-12)
kW-months/year
$6,592
1,125
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
07: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$5,054
Cost:
$400
$3,550 80,300 $1,504 154 - - - - - - - - - - $3,550
80,300
kWh
$1,504
154
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
08: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$3,789
Cost:
$750
$2,661 60,197 $1,128 116 - - - - - - - - - - $2,661
60,197
kWh
$1,128
116
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
09: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,912
Cost:
$4,200
$2,091 47,299 $696 72 - - - - $125 - - - - - $2,091
47,299
kWh
$696
72
kW-months/year
-
-
MMBtu
-
-
lb
$125
-
$
-
-
$
-
-
$
10: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$2,560
Cost:
$1,500
$1,798 40,680 $762 78 - - - - - - - - - - $1,798
40,680
kWh
$762
78
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
11: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$2,489
Cost:
$345
$1,484 33,571 $628 64 - - - - $34 - $343 - - - $1,484
33,571
kWh
$628
64
kW-months/year
-
-
MMBtu
-
-
lb
$34
-
$
$343
-
$
-
-
$
12: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,086
Cost:
$975
$486 10,985 $146 15 - - - - $190 - $264 - - - $486
10,985
kWh
$146
15
kW-months/year
-
-
MMBtu
-
-
lb
$190
-
$
$264
-
$
-
-
$
13: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$967
Cost:
$2,500
$463 10,483 $201 21 - - - - $61 - $242 - - - $463
10,483
kWh
$201
21
kW-months/year
-
-
MMBtu
-
-
lb
$61
-
$
$242
-
$
-
-
$
14: 2.1222 INSTALL TURBULATORS Savings:
$686
Cost:
$1,500
- - - - $686 113 - - - - - - - - -
-
kWh
-
-
kW-months/year
$686
113
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
15: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY Savings:
$3,400
Cost:
$500
- - - - - - $3,400 165,000 - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$3,400
165,000
lb
-
-
$
-
-
$
-
-
$
16: 3.5248 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE Savings:
$2,400
Cost:
$500
- - - - - - $2,400 12,000 - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$2,400
12,000
lb
-
-
$
-
-
$
-
-
$
17: 4.8210 PAY BILLS ON TIME TO AVOID LATE FEES Savings:
$7,293
Cost:
-
- - - - - - - - - - - - $7,293 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
$7,293
-
$
18: 4.4470 AUTOMATE PAYROLL SYSTEM Savings:
$1,352
Cost:
$2,500
- - - - - - - - $1,352 - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
$1,352
-
$
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$178,043
Cost:
$146,635
$32,926 744,892 $15,312 1,573 $114,101 18,845 $5,800 177,000 $1,762 - $849 - $7,293 - $32,926
744,892
kWh
$15,312
1,573
kW-months/year
$114,101
18,845
MMBtu
$5,800
177,000
lb
$1,762
-
$
$849
-
$
$7,293
-
$
TOTAL IMPLEMENTED Savings:
$28,283
Cost:
$10,500
$6,104 138,082 $2,401 247 $6,257 1,067 $5,800 177,000 $186 - $242 - $7,293 - $6,104
138,082
kWh
$2,401
247
kW-months/year
$6,257
1,067
MMBtu
$5,800
177,000
lb
$186
-
$
$242
-
$
$7,293
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $ $ $
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Ancillary Material Cost One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Ancillary Material Cost One-time Revenue or Avoided Cost