Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Bradley University |
---|---|
Assessment Year | 2004 |
Principal Product | Case Cabinets and Component Wood Products |
NAICS | 337110 - Wood Kitchen Cabinet and Countertop Manufacturing |
SIC | 2499 - Wood Products, Nec |
Sales | $50,000,000-$100,000,000 |
# of Employees | 450 |
Plant Area (Sq.Ft.) | 400,000 |
Annual Production | 0 Units |
Production Hrs. Annual | 6,240 |
Location (State) | IL |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $286,605 | 9,385,301 | kWh | $0.03 |
Electricity Demand | $108,944 | 20,848 | kW-months/year | $5.23 |
Natural Gas | $174,554 | 25,908 | MMBtu | $6.74 |
TOTAL ENERGY COSTS | $577,316 | |||
RECOMMENDED SAVINGS* | $97,787 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $56,266 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Personnel Changes | Ancillary Material Cost | Water Consumption | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Personnel Changes | Ancillary Material Cost | Water Consumption | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | $ | $ | $ | $ | $ | Tgal | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE |
Savings: $34,795 Cost: $2,160 |
$753 | 24,674 | $46,418 | 8,875 | - | - | - | - | - | - | $(-12,376) | - | - | - |
$753 24,674 kWh |
$46,418 8,875 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
$(-12,376) - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7231 USE RADIANT HEATER FOR SPOT HEATING |
Savings: $11,608 Cost: $9,000 |
- | - | - | - | $11,608 | 2,025 | - | - | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$11,608 2,025 MMBtu |
- - lb |
- - $ |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $8,569 Cost: $15,260 |
$6,870 | 225,163 | $1,699 | 325 | - | - | - | - | - | - | - | - | - | - |
$6,870 225,163 kWh |
$1,699 325 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 4.111 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK |
Savings: $5,816 Cost: $6,800 |
$5,816 | 190,668 | - | - | - | - | - | - | - | - | - | - | - | - |
$5,816 190,668 kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
- - $ |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $3,047 Cost: $2,175 |
$1,222 | 40,086 | $1,825 | 349 | - | - | - | - | - | - | - | - | - | - |
$1,222 40,086 kWh |
$1,825 349 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $2,778 Cost: $444 |
$2,225 | 72,944 | $553 | 106 | - | - | - | - | - | - | - | - | - | - |
$2,225 72,944 kWh |
$553 106 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.1213 DIRECT WARMEST AIR TO COMBUSTION INTAKE |
Savings: $1,244 Cost: $2,500 |
$(-359) | (-12,413) | - | - | $1,332 | 232 | - | - | $172 | - | $99 | - | - | - |
$(-359) (-12,413) kWh |
- - kW-months/year |
$1,332 232 MMBtu |
- - lb |
$172 - $ |
$99 - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $185 Cost: $1,080 |
$127 | 4,149 | $58 | 11 | - | - | - | - | - | - | - | - | - | - |
$127 4,149 kWh |
$58 11 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $346 Cost: $135 |
$255 | 8,359 | $86 | 17 | - | - | - | - | $5 | - | - | - | - | - |
$255 8,359 kWh |
$86 17 kW-months/year |
- - MMBtu |
- - lb |
$5 - $ |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER |
Savings: $24,450 Cost: $1,000 |
- | - | - | - | - | - | $24,450 | 1,012,000 | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$24,450 1,012,000 lb |
- - $ |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER |
Savings: $3,873 Cost: $640 |
- | - | - | - | - | - | $3,873 | 128,000 | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$3,873 128,000 lb |
- - $ |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
12: 3.4151 MINIMIZE WATER USAGE |
Savings: $1,076 Cost: $690 |
- | - | - | - | - | - | - | - | - | - | - | - | $1,076 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
- - $ |
- - $ |
$1,076 - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $97,787 Cost: $41,884 |
$16,909 | 553,630 | $50,639 | 9,683 | $12,940 | 2,257 | $28,323 | 1,140,000 | $177 | - | $(-12,277) | - | $1,076 | - | $16,909 553,630 kWh |
$50,639 9,683 kW-months/year |
$12,940 2,257 MMBtu |
$28,323 1,140,000 lb |
$177 - $ |
$(-12,277) - $ |
$1,076 - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $56,266 Cost: $28,609 |
$17,013 | 557,684 | $50,553 | 9,666 | - | - | - | - | - | - | $(-12,376) | - | $1,076 | - | $17,013 557,684 kWh |
$50,553 9,666 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
$(-12,376) - $ |
$1,076 - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | $ | $ | $ | $ | $ | Tgal | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Personnel Changes | Ancillary Material Cost | Water Consumption | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Personnel Changes | Ancillary Material Cost | Water Consumption |